2022 permits

Toronto building permits from 2022: 10,401 are still open

Of the building permits Toronto issued in 2022, 10,401 remained in the City’s active permit register, and half of them have been open for at least 1,476 days (about 4 years).

This is not annual permit volume. The 2022 figures on this page count permits that are still openin the City of Toronto’s active permit register today. Permits drop out of that register once they close, so older years show fewer surviving records the further back you go. Toronto issues roughly 30,000 to 40,000 permits a year; the counts here are the unclosed remainder, and they cannot be compared between years as a trend.

Still open

10,401

Median time open

1,476 d

Median value

$100,000

Total value

$5,677,741,415

Value figures cover the 4,710 of 10,401 still-open 2022 permits that disclose an estimated construction cost. Medians, not averages: the cost distribution has a long tail and an average would overstate the typical permit.

What stage the 2022 permits are at

2,009 of them (19.3%) show no sign of work having begun: the permit was issued and the file has not moved past that point.

StatusPermitsShare
Inspection
6,443
61.9%
Permit Issued
1,923
18.5%
Revision Issued
1,156
11.1%
Revocation Pending
790
7.6%
Work Not Started
86
0.8%
Application On Hold
2
0.0%
Work Suspended
1
0.0%

Still-open 2022 permits by trade

TradePermitsTotal value
Plumbing2,219$90,620,108
Addition2,125$376,218,177
Interior alteration1,619$712,797,275
HVAC1,287$323,680,748
New build1,041$3,542,779,831
Deck633$113,407,353
Other / unclassified516$80,577,021
Demolition320$132,683,671
Window / Door307$35,741,195
Roofing208$153,219,248
Pool89$36,315,240
Electrical37$79,701,548

Neighbourhoods with the most open 2022 permits

RankNeighbourhoodOpen permitsTotal value
1Bendale-Glen Andrew400$363,579,308
2Yonge-Bay Corridor276$737,270,448
3Annex212$31,790,291
4Yonge-Doris191$6,020,730
5The Beaches176$24,829,045
6Rosedale-Moore Park174$79,755,495
7Banbury-Don Mills169$25,811,004
8South Riverdale161$37,294,722
9Birchcliffe-Cliffside160$17,512,685
10West Humber-Clairville155$20,584,320
11High Park-Swansea143$10,820,334
12Stonegate-Queensway133$22,972,770
13Wellington Place129$27,059,000
14Palmerston-Little Italy123$360,458,597
15Trinity-Bellwoods122$17,120,500
16Kensington-Chinatown122$16,724,191
17Wexford/Maryvale118$6,563,938
18Englemount-Lawrence116$31,003,241
19Roncesvalles115$10,040,650
20York University Heights115$11,210,662

Top 20 neighbourhoods by open-permit count. Areas outside this list still have open 2022 permits.

Largest 2022 projects still open

The highest-value permits from 2022 that have not closed out, ranked by estimated construction cost.

AddressWorkStatusOpenValue
11 Centre Ave, Toronto, ONNew BuildingInspection1,343 d$505,000,000
1 Bloor St W, Toronto, ONNew BuildingInspection1,449 d$485,000,000
571 Bloor St W, Toronto, ONNew BuildingInspection1,429 d$330,000,000
300 Borough Dr, Toronto, ONMultiple ProjectsInspection1,438 d$250,000,000
391 Cherry St, Toronto, ONNew BuildingInspection1,423 d$220,000,000
1001 Sheppard Ave E, Toronto, ONNew BuildingInspection1,493 d$160,000,000
1001 Sheppard Ave E, Toronto, ONNew BuildingInspection1,464 d$160,000,000
261 Queens Quay E, Toronto, ONNew BuildingInspection1,333 d$150,000,000
628 Church St, Toronto, ONNew BuildingInspection1,364 d$101,000,000
1 Blue Jays Way, Toronto, ONInterior AlterationsInspection1,472 d$100,000,000
481 University Ave, Toronto, ONNew BuildingInspection1,445 d$100,000,000
1 Blue Jays Way, Toronto, ONInterior AlterationsInspection1,346 d$100,000,000
625 Runnymede Rd, Toronto, ONNew BuildingInspection1,549 d$80,000,000
289 The Kingsway, Toronto, ONNew BuildingInspection1,373 d$80,000,000
3050 Lawrence Ave E, Toronto, ONInterior AlterationsInspection1,542 d$63,583,208
939 Eglinton Ave E, Toronto, ONNew BuildingInspection1,659 d$60,000,000
59 Mutual St, Toronto, ONNew BuildingInspection1,484 d$60,000,000
150 Sterling Rd, Toronto, ONNew BuildingInspection1,394 d$56,436,000
150 Sterling Rd, Toronto, ONNew BuildingInspection1,378 d$56,436,000
150 College St, Toronto, ONMultiple ProjectsInspection1,448 d$50,826,000
248 High Park Ave, Toronto, ONNew BuildingInspection1,625 d$50,000,000
1808 St Clair Ave W, Toronto, ONNew BuildingInspection1,617 d$50,000,000
150 College St, Toronto, ONNew BuildingInspection1,408 d$50,000,000
6 Gloucester St, Toronto, ONNew BuildingInspection1,331 d$50,000,000
75 Broadway Ave, Toronto, ONNew BuildingInspection1,308 d$50,000,000

“Open” counts days from issue date to Jul 23, 2026. A permit remaining open does not by itself mean a project is abandoned; the City closes permits on final inspection, and some long-running projects are still legitimately active.

Track new Toronto permits the day they are issued. Historical pages show what is still open. Sign in free to see what was filed this morning.

Frequently asked questions

How many Toronto building permits from 2022 are still open?
10,401 permits issued in Toronto during 2022 were still in the City's active permit register. This is the count of permits that have not closed out, not the number of permits Toronto issued in 2022. The City issues roughly 30,000 to 40,000 permits a year, and closed permits are removed from the published file.
How long have Toronto's 2022 permits been open?
Half of the 10,401 still-open permits from 2022 have been open for at least 1,476 days (about 4 years), measured from issue date to Jul 23, 2026. One in ten has been open longer than 1,619 days (about 4 years). These are permits the City has not closed out, which can mean a long-running project, a stalled one, or one that was finished without being signed off.
How many 2022 Toronto permits were never started?
2,009 of the 10,401 surviving 2022 permits (19.3%) sit at a status indicating work has not visibly begun, such as "Permit Issued" or "Work Not Started". The approval was granted and the file shows no progression past it. The remainder are at inspection or revision stages.
Can I compare 2022 to other years?
No. Each year's count reflects how long its permits have had to close, so an older year showing fewer permits means more of them closed, not that less was built. Comparing 2022 to another year measures elapsed time rather than construction activity. Use the status and trade breakdowns within 2022 instead.