Toronto building permits from 2023: 12,039 are still open

Of the building permits Toronto issued in 2023, 12,039 remained in the City’s active permit register, and half of them have been open for at least 1,099 days (about 3 years).

This is not annual permit volume. The 2023 figures on this page count permits that are still openin the City of Toronto’s active permit register today. Permits drop out of that register once they close, so older years show fewer surviving records the further back you go. Toronto issues roughly 30,000 to 40,000 permits a year; the counts here are the unclosed remainder, and they cannot be compared between years as a trend.

Still open

12,039

Median time open

1,099 d

Median value

$100,000

Total value

$7,939,034,578

Value figures cover the 4,692 of 12,039 still-open 2023 permits that disclose an estimated construction cost. Medians, not averages: the cost distribution has a long tail and an average would overstate the typical permit.

What stage the 2023 permits are at

2,633 of them (21.9%) show no sign of work having begun: the permit was issued and the file has not moved past that point.

StatusPermitsShare
Inspection
7,496
62.3%
Permit Issued
2,574
21.4%
Revision Issued
1,360
11.3%
Revocation Pending
549
4.6%
Work Not Started
59
0.5%
Under Review
1
0.0%

Still-open 2023 permits by trade

TradePermitsTotal value
Plumbing2,388$68,950,150
Addition2,302$733,444,759
New build1,926$5,350,482,345
Interior alteration1,571$1,141,401,330
HVAC1,485$125,365,182
Other / unclassified628$43,914,471
Demolition590$172,880,151
Deck548$86,317,528
Window / Door258$29,784,858
Roofing205$55,502,085
Pool109$38,543,466
Electrical29$92,448,253

Neighbourhoods with the most open 2023 permits

RankNeighbourhoodOpen permitsTotal value
1Malvern West625$786,150
2Bendale-Glen Andrew403$118,905,575
3Yonge-Bay Corridor312$386,079,942
4Etobicoke City Centre259$1,472,047,550
5Annex249$79,375,810
6Rosedale-Moore Park232$54,577,536
7Banbury-Don Mills205$145,096,205
8West Humber-Clairville200$243,788,852
9South Riverdale191$85,552,300
10The Beaches172$26,181,320
11Birchcliffe-Cliffside169$75,946,044
12Trinity-Bellwoods158$13,339,094
13High Park-Swansea154$15,287,835
14Stonegate-Queensway143$18,392,476
15Kensington-Chinatown139$41,046,738
16Clairlea-Birchmount138$121,183,250
17Bedford Park-Nortown135$30,308,150
18St.Andrew-Windfields132$19,514,637
19Wellington Place131$577,848,700
20Leaside-Bennington131$25,151,000

Top 20 neighbourhoods by open-permit count. Areas outside this list still have open 2023 permits.

Largest 2023 projects still open

The highest-value permits from 2023 that have not closed out, ranked by estimated construction cost.

AddressWorkStatusOpenValue
150 Sherway Dr, Toronto, ONMultiple ProjectsInspection1,072 d$480,000,000
150 Sherway Dr, Toronto, ONNew BuildingInspection1,014 d$480,000,000
150 Sherway Dr, Toronto, ONNew BuildingInspection1,003 d$480,000,000
539 King St W, Toronto, ONNew BuildingInspection1,157 d$305,000,000
40 Temperance St, Toronto, ONNew BuildingRevision Issued1,242 d$300,000,000
530 Front St W, Toronto, ONNew BuildingInspection1,126 d$235,000,000
65 Broadway Ave, Toronto, ONNew BuildingInspection1,185 d$206,000,000
38 Annie Craig Dr, Toronto, ONNew BuildingInspection1,109 d$195,000,000
55 Charles St E, Toronto, ONNew BuildingRevision Issued1,213 d$160,000,000
276 Main St, Toronto, ONNew BuildingInspection1,022 d$150,000,000
45 Strachan Ave, Toronto, ONNew BuildingInspection1,148 d$138,000,000
610 Martin Grove Rd, Toronto, ONNew BuildingInspection1,210 d$130,000,000
308 Jarvis St, Toronto, ONNew BuildingInspection1,108 d$130,000,000
100 Devonshire Pl, Toronto, ONAddition(s)Inspection1,197 d$120,000,000
90 Eastdale Ave, Toronto, ONNew BuildingInspection1,227 d$110,000,000
89 Church St, Toronto, ONNew BuildingInspection1,086 d$102,278,659
2161 Yonge St, Toronto, ONNew BuildingInspection1,196 d$102,000,000
555 Rexdale Blvd, Toronto, ONMultiple ProjectsInspection1,224 d$100,000,000
3050 Pharmacy Ave, Toronto, ONNew BuildingInspection1,213 d$100,000,000
844 Don Mills Rd, Toronto, ONNew BuildingInspection1,049 d$100,000,000
1 Blue Jays Way, Toronto, ONInterior AlterationsInspection1,086 d$96,000,000
2135 Sheppard Ave E, Toronto, ONNew BuildingInspection1,206 d$90,000,000
6 Hoskin Ave, Toronto, ONNew BuildingInspection1,171 d$90,000,000
1221 King St W, Toronto, ONNew BuildingInspection1,268 d$85,000,000
2690 Eglinton Ave W, Toronto, ONOther(BA)Inspection995 d$71,290,000

“Open” counts days from issue date to Jul 23, 2026. A permit remaining open does not by itself mean a project is abandoned; the City closes permits on final inspection, and some long-running projects are still legitimately active.

Track new Toronto permits the day they are issued. Historical pages show what is still open. Sign in free to see what was filed this morning.

Frequently asked questions

How many Toronto building permits from 2023 are still open?
12,039 permits issued in Toronto during 2023 were still in the City's active permit register. This is the count of permits that have not closed out, not the number of permits Toronto issued in 2023. The City issues roughly 30,000 to 40,000 permits a year, and closed permits are removed from the published file.
How long have Toronto's 2023 permits been open?
Half of the 12,039 still-open permits from 2023 have been open for at least 1,099 days (about 3 years), measured from issue date to Jul 23, 2026. One in ten has been open longer than 1,254 days (about 3 years). These are permits the City has not closed out, which can mean a long-running project, a stalled one, or one that was finished without being signed off.
How many 2023 Toronto permits were never started?
2,633 of the 12,039 surviving 2023 permits (21.9%) sit at a status indicating work has not visibly begun, such as "Permit Issued" or "Work Not Started". The approval was granted and the file shows no progression past it. The remainder are at inspection or revision stages.
Can I compare 2023 to other years?
No. Each year's count reflects how long its permits have had to close, so an older year showing fewer permits means more of them closed, not that less was built. Comparing 2023 to another year measures elapsed time rather than construction activity. Use the status and trade breakdowns within 2023 instead.