Toronto building permits from 2021: 9,112 are still open

Of the building permits Toronto issued in 2021, 9,112 remained in the City’s active permit register, and half of them have been open for at least 1,847 days (about 5 years).

This is not annual permit volume. The 2021 figures on this page count permits that are still openin the City of Toronto’s active permit register today. Permits drop out of that register once they close, so older years show fewer surviving records the further back you go. Toronto issues roughly 30,000 to 40,000 permits a year; the counts here are the unclosed remainder, and they cannot be compared between years as a trend.

Still open

9,112

Median time open

1,847 d

Median value

$83,165

Total value

$6,189,030,938

Value figures cover the 4,265 of 9,112 still-open 2021 permits that disclose an estimated construction cost. Medians, not averages: the cost distribution has a long tail and an average would overstate the typical permit.

What stage the 2021 permits are at

1,669 of them (18.3%) show no sign of work having begun: the permit was issued and the file has not moved past that point.

StatusPermitsShare
Inspection
5,789
63.5%
Permit Issued
1,608
17.6%
Revision Issued
1,057
11.6%
Revocation Pending
596
6.5%
Work Not Started
60
0.7%
Ready for Issuance
1
0.0%
Application On Hold
1
0.0%

Still-open 2021 permits by trade

TradePermitsTotal value
Plumbing1,862$84,852,289
Addition1,859$370,963,678
Interior alteration1,596$713,235,405
HVAC1,196$246,464,777
New build843$4,456,963,584
Deck500$55,438,017
Other / unclassified476$54,986,742
Window / Door257$45,132,464
Demolition216$59,201,864
Roofing188$64,169,265
Pool86$27,596,600
Electrical33$10,026,253

Neighbourhoods with the most open 2021 permits

RankNeighbourhoodOpen permitsTotal value
1Annex223$286,280,244
2Yonge-Bay Corridor203$187,558,105
3South Riverdale192$100,677,792
4High Park-Swansea171$72,273,242
5West Humber-Clairville164$132,206,121
6Stonegate-Queensway154$62,060,131
7Rosedale-Moore Park150$75,221,500
8Kingsway South146$7,423,700
9Wexford/Maryvale135$9,491,140
10Trinity-Bellwoods131$15,067,000
11Roncesvalles130$45,584,000
12Beechborough-Greenbrook128$73,529,403
13Etobicoke City Centre122$263,433,340
14The Beaches117$9,961,444
15St.Andrew-Windfields116$24,880,090
16Kensington-Chinatown115$87,993,499
17Birchcliffe-Cliffside113$59,173,455
18Banbury-Don Mills111$125,185,682
19York University Heights110$94,358,587
20Bedford Park-Nortown107$37,044,400

Top 20 neighbourhoods by open-permit count. Areas outside this list still have open 2021 permits.

Largest 2021 projects still open

The highest-value permits from 2021 that have not closed out, ranked by estimated construction cost.

AddressWorkStatusOpenValue
112 College St, Toronto, ONNew BuildingInspection1,896 d$600,000,000
500 Lake Shore Blvd W, Toronto, ONNew BuildingInspection1,897 d$200,000,000
1926 Lake Shore Blvd W, Toronto, ONNew BuildingInspection2,015 d$175,000,000
55 Charles St E, Toronto, ONNew BuildingInspection1,931 d$160,000,000
15 Mercer St, Toronto, ONNew BuildingInspection1,844 d$150,000,000
117 Broadway Ave, Toronto, ONNew BuildingInspection1,759 d$150,000,000
10 Eva Rd, Toronto, ONNew BuildingInspection1,711 d$150,000,000
4917-4975 Yonge St, Toronto, ONNew BuildingInspection1,940 d$149,584,000
620 Dundas St E, Toronto, ONNew BuildingInspection1,830 d$130,000,000
5220 Yonge St, Toronto, ONNew BuildingInspection1,805 d$122,000,000
5220 Yonge St, Toronto, ONSite ServiceInspection1,772 d$122,000,000
30 Zorra St, Toronto, ONNew BuildingInspection1,728 d$110,522,000
275 Albany Ave, Toronto, ONNew BuildingInspection1,994 d$110,000,000
19 Duncan St, Toronto, ONNew BuildingInspection1,793 d$100,000,000
593 Yonge St, Toronto, ONNew BuildingInspection2,004 d$95,000,000
39 Roehampton Ave, Toronto, ONNew BuildingInspection1,925 d$93,000,000
834 Yonge St, Toronto, ONNew BuildingInspection1,959 d$80,000,000
11-21 Allenbury Gdns, Toronto, ONNew BuildingInspection1,876 d$80,000,000
203 Jarvis St, Toronto, ONNew BuildingInspection1,875 d$80,000,000
3415-3499 Weston Rd, Toronto, ONNew BuildingInspection1,744 d$80,000,000
40 Widmer St, Toronto, ONNew BuildingInspection1,812 d$70,000,000
600 Dixon Rd, Toronto, ONNew BuildingInspection1,736 d$70,000,000
2112-2114 Yonge St, Toronto, ONNew BuildingInspection1,885 d$69,000,000
49 The Donway W, Toronto, ONNew BuildingInspection1,757 d$65,266,838
25 Vickers Rd, Toronto, ONNew BuildingInspection1,700 d$64,000,000

“Open” counts days from issue date to Jul 23, 2026. A permit remaining open does not by itself mean a project is abandoned; the City closes permits on final inspection, and some long-running projects are still legitimately active.

Track new Toronto permits the day they are issued. Historical pages show what is still open. Sign in free to see what was filed this morning.

Frequently asked questions

How many Toronto building permits from 2021 are still open?
9,112 permits issued in Toronto during 2021 were still in the City's active permit register. This is the count of permits that have not closed out, not the number of permits Toronto issued in 2021. The City issues roughly 30,000 to 40,000 permits a year, and closed permits are removed from the published file.
How long have Toronto's 2021 permits been open?
Half of the 9,112 still-open permits from 2021 have been open for at least 1,847 days (about 5 years), measured from issue date to Jul 23, 2026. One in ten has been open longer than 1,989 days (about 5 years). These are permits the City has not closed out, which can mean a long-running project, a stalled one, or one that was finished without being signed off.
How many 2021 Toronto permits were never started?
1,669 of the 9,112 surviving 2021 permits (18.3%) sit at a status indicating work has not visibly begun, such as "Permit Issued" or "Work Not Started". The approval was granted and the file shows no progression past it. The remainder are at inspection or revision stages.
Can I compare 2021 to other years?
No. Each year's count reflects how long its permits have had to close, so an older year showing fewer permits means more of them closed, not that less was built. Comparing 2021 to another year measures elapsed time rather than construction activity. Use the status and trade breakdowns within 2021 instead.