Toronto building permits from 2018: 8,264 are still open

Of the building permits Toronto issued in 2018, 8,264 remained in the City’s active permit register, and half of them have been open for at least 2,940 days (about 8 years).

This is not annual permit volume. The 2018 figures on this page count permits that are still openin the City of Toronto’s active permit register today. Permits drop out of that register once they close, so older years show fewer surviving records the further back you go. Toronto issues roughly 30,000 to 40,000 permits a year; the counts here are the unclosed remainder, and they cannot be compared between years as a trend.

Still open

8,264

Median time open

2,940 d

Median value

$60,000

Total value

$3,641,096,627

Value figures cover the 4,142 of 8,264 still-open 2018 permits that disclose an estimated construction cost. Medians, not averages: the cost distribution has a long tail and an average would overstate the typical permit.

What stage the 2018 permits are at

1,544 of them (18.7%) show no sign of work having begun: the permit was issued and the file has not moved past that point.

StatusPermitsShare
Inspection
5,481
66.3%
Permit Issued
1,507
18.2%
Revision Issued
962
11.6%
Revocation Pending
275
3.3%
Work Not Started
37
0.4%
Application On Hold
1
0.0%
Work Suspended
1
0.0%

Still-open 2018 permits by trade

TradePermitsTotal value
Addition1,600$224,598,675
Interior alteration1,566$510,530,043
Plumbing1,540$95,572,564
HVAC1,081$60,887,736
New build768$2,461,816,720
Other / unclassified518$59,400,206
Deck417$35,080,329
Demolition279$58,016,000
Roofing218$58,982,362
Window / Door213$49,379,600
Pool35$16,546,140
Electrical29$10,286,253

Neighbourhoods with the most open 2018 permits

RankNeighbourhoodOpen permitsTotal value
1Yonge-Bay Corridor281$66,655,274
2Annex203$294,060,688
3Wexford/Maryvale189$23,467,104
4South Riverdale171$44,875,610
5West Humber-Clairville150$27,486,650
6Stonegate-Queensway141$10,600,560
7Etobicoke City Centre140$32,583,500
8Kensington-Chinatown136$48,283,500
9High Park-Swansea128$8,466,289
10Wellington Place122$236,653,633
11Englemount-Lawrence118$31,214,228
12Trinity-Bellwoods112$11,563,000
13Bay-Cloverhill108$182,404,830
14The Beaches108$42,371,600
15Rosedale-Moore Park101$11,827,900
16High Park North101$148,638,260
17Palmerston-Little Italy96$29,991,500
18St Lawrence-East Bayfront-The Islands92$136,694,150
19Leaside-Bennington91$15,106,200
20Birchcliffe-Cliffside89$4,588,178

Top 20 neighbourhoods by open-permit count. Areas outside this list still have open 2018 permits.

Largest 2018 projects still open

The highest-value permits from 2018 that have not closed out, ranked by estimated construction cost.

AddressWorkStatusOpenValue
2221 Yonge St, Toronto, ONNew BuildingInspection2,849 d$300,000,000
95 Broadway Ave, Toronto, ONNew BuildingInspection2,873 d$150,000,000
11 Wellesley St W, Toronto, ONNew BuildingInspection2,775 d$150,000,000
2131 Yonge St, Toronto, ONNew BuildingInspection2,785 d$135,000,000
578 Front St W, Toronto, ONNew BuildingInspection2,978 d$130,000,000
836 Yonge St, Toronto, ONNew BuildingInspection2,956 d$110,000,000
130 Queens Quay E, Toronto, ONNew BuildingInspection3,040 d$104,000,000
1240 Bay St, Toronto, ONInterior AlterationsPermit Issued3,052 d$100,000,000
33-45 Niagara St, Toronto, ONNew BuildingInspection2,995 d$90,000,000
3105 Sheppard Ave E, Toronto, ONNew BuildingInspection2,883 d$71,412,460
275 Village Green Sq, Toronto, ONNew BuildingInspection2,876 d$66,000,000
2205 Sheppard Ave E, Toronto, ONNew BuildingInspection2,935 d$65,000,000
125 George Henry Blvd, Toronto, ONNew BuildingInspection2,838 d$58,900,000
2175 Lake Shore Blvd W, Toronto, ONNew BuildingInspection3,067 d$55,000,000
124 Pears Ave, Toronto, ONNew BuildingInspection3,002 d$52,500,000
51-65 Quebec Ave, Toronto, ONNew BuildingInspection2,823 d$52,500,000
52-66 High Park Ave, Toronto, ONNew BuildingInspection2,822 d$52,500,000
40 Wellesley St E, Toronto, ONNew BuildingInspection3,102 d$45,000,000
93 Berkeley St, Toronto, ONNew BuildingInspection2,775 d$45,000,000
150 River St, Toronto, ONNew BuildingInspection2,872 d$43,500,000
4650 Eglinton Ave W, Toronto, ONNew BuildingInspection2,915 d$42,000,000
1028 Mcnicoll Ave, Toronto, ONNew BuildingInspection2,827 d$36,000,000
160 Transit Rd, Toronto, ONInterior AlterationsPermit Issued3,048 d$35,000,000
32-50 Forest Manor Rd, Toronto, ONNew BuildingInspection2,928 d$35,000,000
600 University Ave, Toronto, ONInterior AlterationsInspection2,809 d$35,000,000

“Open” counts days from issue date to Jul 23, 2026. A permit remaining open does not by itself mean a project is abandoned; the City closes permits on final inspection, and some long-running projects are still legitimately active.

Track new Toronto permits the day they are issued. Historical pages show what is still open. Sign in free to see what was filed this morning.

Frequently asked questions

How many Toronto building permits from 2018 are still open?
8,264 permits issued in Toronto during 2018 were still in the City's active permit register. This is the count of permits that have not closed out, not the number of permits Toronto issued in 2018. The City issues roughly 30,000 to 40,000 permits a year, and closed permits are removed from the published file.
How long have Toronto's 2018 permits been open?
Half of the 8,264 still-open permits from 2018 have been open for at least 2,940 days (about 8 years), measured from issue date to Jul 23, 2026. One in ten has been open longer than 3,083 days (about 8 years). These are permits the City has not closed out, which can mean a long-running project, a stalled one, or one that was finished without being signed off.
How many 2018 Toronto permits were never started?
1,544 of the 8,264 surviving 2018 permits (18.7%) sit at a status indicating work has not visibly begun, such as "Permit Issued" or "Work Not Started". The approval was granted and the file shows no progression past it. The remainder are at inspection or revision stages.
Can I compare 2018 to other years?
No. Each year's count reflects how long its permits have had to close, so an older year showing fewer permits means more of them closed, not that less was built. Comparing 2018 to another year measures elapsed time rather than construction activity. Use the status and trade breakdowns within 2018 instead.

Other years