2019 permits

Toronto building permits from 2019: 8,656 are still open

Of the building permits Toronto issued in 2019, 8,656 remained in the City’s active permit register, and half of them have been open for at least 2,570 days (about 7 years).

This is not annual permit volume. The 2019 figures on this page count permits that are still openin the City of Toronto’s active permit register today. Permits drop out of that register once they close, so older years show fewer surviving records the further back you go. Toronto issues roughly 30,000 to 40,000 permits a year; the counts here are the unclosed remainder, and they cannot be compared between years as a trend.

Still open

8,656

Median time open

2,570 d

Median value

$60,000

Total value

$3,042,398,391

Value figures cover the 4,140 of 8,656 still-open 2019 permits that disclose an estimated construction cost. Medians, not averages: the cost distribution has a long tail and an average would overstate the typical permit.

What stage the 2019 permits are at

1,563 of them (18.1%) show no sign of work having begun: the permit was issued and the file has not moved past that point.

StatusPermitsShare
Inspection
5,597
64.7%
Permit Issued
1,499
17.3%
Revision Issued
1,123
13.0%
Revocation Pending
370
4.3%
Work Not Started
62
0.7%
Ready for Issuance
2
0.0%
Work Suspended
1
0.0%
Pending Cancellation
1
0.0%
Refusal Notice
1
0.0%

Still-open 2019 permits by trade

TradePermitsTotal value
Plumbing1,874$211,263,759
Interior alteration1,779$419,299,001
Addition1,586$248,019,776
HVAC1,137$47,449,100
New build730$1,799,215,253
Other / unclassified463$70,492,424
Deck388$37,591,460
Roofing213$81,912,697
Window / Door212$45,805,293
Demolition198$36,958,106
Pool47$28,280,700
Electrical29$16,110,822

Neighbourhoods with the most open 2019 permits

RankNeighbourhoodOpen permitsTotal value
1Yorkdale-Glen Park242$22,285,800
2Yonge-Bay Corridor233$87,344,375
3Annex193$56,295,802
4The Beaches182$13,612,972
5Kensington-Chinatown182$135,826,614
6South Riverdale175$184,497,100
7Wexford/Maryvale161$24,573,500
8West Humber-Clairville147$43,359,946
9Yonge-St.Clair145$57,410,000
10High Park-Swansea142$22,198,980
11Rosedale-Moore Park128$12,174,557
12York University Heights127$8,756,285
13Stonegate-Queensway123$15,621,000
14Wellington Place117$106,858,350
15Etobicoke City Centre115$22,682,385
16St Lawrence-East Bayfront-The Islands108$38,006,118
17High Park North107$26,266,977
18Moss Park101$5,110,800
19Trinity-Bellwoods100$6,933,003
20Junction Area93$7,100,700

Top 20 neighbourhoods by open-permit count. Areas outside this list still have open 2019 permits.

Largest 2019 projects still open

The highest-value permits from 2019 that have not closed out, ranked by estimated construction cost.

AddressWorkStatusOpenValue
7 Leslie St, Toronto, ONInside and Outside DrainsRevision Issued2,533 d$162,000,000
197 Yonge St, Toronto, ONNew BuildingInspection2,725 d$142,000,000
1100 King St W, Toronto, ONNew BuildingInspection2,757 d$125,000,000
387 Bloor St E, Toronto, ONNew BuildingInspection2,457 d$116,000,000
44 Dunfield Ave, Toronto, ONNew BuildingInspection2,610 d$100,000,000
571 Dundas St W, Toronto, ONNew BuildingInspection2,670 d$80,000,000
20 Tubman Ave, Toronto, ONNew BuildingInspection2,585 d$77,888,000
283 Adelaide St W, Toronto, ONNew BuildingInspection2,478 d$73,000,000
225 Village Green Sq, Toronto, ONNew BuildingInspection2,407 d$68,000,000
25 Thunder Grv, Toronto, ONNew BuildingInspection2,625 d$64,000,000
2360 Yonge St, Toronto, ONNew BuildingInspection2,722 d$62,250,878
2281 Yonge St, Toronto, ONNew BuildingInspection2,632 d$50,000,000
65 Grand Magazine St, Toronto, ONNew BuildingInspection2,557 d$50,000,000
281 Avenue Rd, Toronto, ONNew BuildingInspection2,506 d$50,000,000
75 Canterbury Pl, Toronto, ONNew BuildingInspection2,733 d$47,675,400
2143 Lake Shore Blvd W, Toronto, ONNew BuildingInspection2,435 d$45,000,000
1630 Queen St E, Toronto, ONNew BuildingInspection2,611 d$40,000,000
600 University Ave, Toronto, ONInterior AlterationsInspection2,722 d$35,000,000
11-21 Allenbury Gdns, Toronto, ONNew BuildingInspection2,477 d$35,000,000
437 Yonge St, Toronto, ONAddition(s)Inspection2,457 d$30,700,000
65 Livingston Rd, Toronto, ONNew BuildingInspection2,669 d$30,000,000
143 Avenue Rd, Toronto, ONNew BuildingInspection2,597 d$30,000,000
2 Queen St W, Toronto, ONMultiple ProjectsInspection2,488 d$30,000,000
500 Cummer Ave, Toronto, ONNew BuildingInspection2,478 d$26,000,000
130 St George St, Toronto, ONNew BuildingInspection2,565 d$24,750,000

“Open” counts days from issue date to Jul 23, 2026. A permit remaining open does not by itself mean a project is abandoned; the City closes permits on final inspection, and some long-running projects are still legitimately active.

Track new Toronto permits the day they are issued. Historical pages show what is still open. Sign in free to see what was filed this morning.

Frequently asked questions

How many Toronto building permits from 2019 are still open?
8,656 permits issued in Toronto during 2019 were still in the City's active permit register. This is the count of permits that have not closed out, not the number of permits Toronto issued in 2019. The City issues roughly 30,000 to 40,000 permits a year, and closed permits are removed from the published file.
How long have Toronto's 2019 permits been open?
Half of the 8,656 still-open permits from 2019 have been open for at least 2,570 days (about 7 years), measured from issue date to Jul 23, 2026. One in ten has been open longer than 2,717 days (about 7 years). These are permits the City has not closed out, which can mean a long-running project, a stalled one, or one that was finished without being signed off.
How many 2019 Toronto permits were never started?
1,563 of the 8,656 surviving 2019 permits (18.1%) sit at a status indicating work has not visibly begun, such as "Permit Issued" or "Work Not Started". The approval was granted and the file shows no progression past it. The remainder are at inspection or revision stages.
Can I compare 2019 to other years?
No. Each year's count reflects how long its permits have had to close, so an older year showing fewer permits means more of them closed, not that less was built. Comparing 2019 to another year measures elapsed time rather than construction activity. Use the status and trade breakdowns within 2019 instead.