Toronto building permits from 2007: 4,708 are still open

Of the building permits Toronto issued in 2007, 4,708 remained in the City’s active permit register, and half of them have been open for at least 6,945 days (about 19 years).

This is not annual permit volume. The 2007 figures on this page count permits that are still openin the City of Toronto’s active permit register today. Permits drop out of that register once they close, so older years show fewer surviving records the further back you go. Toronto issues roughly 30,000 to 40,000 permits a year; the counts here are the unclosed remainder, and they cannot be compared between years as a trend.

Still open

4,708

Median time open

6,945 d

Median value

$60,000

Total value

$864,459,816

Value figures cover the 2,381 of 4,708 still-open 2007 permits that disclose an estimated construction cost. Medians, not averages: the cost distribution has a long tail and an average would overstate the typical permit.

What stage the 2007 permits are at

246 of them (5.2%) show no sign of work having begun: the permit was issued and the file has not moved past that point.

StatusPermitsShare
Inspection
4,047
86.0%
Revision Issued
408
8.7%
Permit Issued
198
4.2%
Work Not Started
48
1.0%
Revocation Pending
4
0.1%
Work Suspended
3
0.1%

Still-open 2007 permits by trade

TradePermitsTotal value
Addition1,228$118,587,211
Interior alteration867$188,609,621
Plumbing664$4,504,811
HVAC602$13,180,937
New build537$440,778,258
Other / unclassified260$19,337,872
Deck232$14,110,111
Roofing117$20,761,394
Demolition98$9,265,400
Window / Door78$17,099,000
Pool18$16,995,200
Electrical7$1,230,001

Neighbourhoods with the most open 2007 permits

RankNeighbourhoodOpen permitsTotal value
1Yonge-Bay Corridor162$37,833,280
2Bedford Park-Nortown133$15,361,323
3West Humber-Clairville127$18,393,500
4Rosedale-Moore Park125$15,848,000
5Mimico-Queensway108$4,749,932
6High Park-Swansea103$54,978,000
7Leaside-Bennington99$6,835,004
8South Riverdale97$7,783,750
9North Riverdale89$4,194,000
10Kensington-Chinatown87$37,041,230
11Stonegate-Queensway87$5,518,000
12Annex86$10,044,980
13Islington74$5,077,000
14Kingsway South74$4,534,500
15The Beaches70$3,761,200
16Yorkdale-Glen Park64$4,529,800
17High Park North62$2,535,400
18Clairlea-Birchmount62$16,214,330
19Etobicoke City Centre60$87,034,000
20Yonge-Eglinton56$4,304,200

Top 20 neighbourhoods by open-permit count. Areas outside this list still have open 2007 permits.

Largest 2007 projects still open

The highest-value permits from 2007 that have not closed out, ranked by estimated construction cost.

AddressWorkStatusOpenValue
30 The Queensway, Toronto, ONNew BuildingInspection6,930 d$50,000,000
25 Greenview Ave, Toronto, ONNew BuildingInspection6,831 d$47,500,000
700 Evans Ave, Toronto, ONNew BuildingInspection6,964 d$35,000,000
468 Avenue Rd, Toronto, ONNew BuildingInspection6,790 d$35,000,000
700 Evans Ave, Toronto, ONNew BuildingInspection6,909 d$30,000,000
21 Carlton St, Toronto, ONNew BuildingInspection6,855 d$30,000,000
80 Western Battery Rd, Toronto, ONNew BuildingInspection6,939 d$26,000,000
82 Broadway Ave, Toronto, ONNew BuildingInspection7,091 d$23,000,000
2 Fieldway Rd, Toronto, ONInterior AlterationsInspection6,796 d$20,000,000
455 Adelaide St W, Toronto, ONNew BuildingInspection6,789 d$16,000,000
148 Jarvis St, Toronto, ONNew BuildingInspection6,882 d$15,650,000
1 Dundas St W, Toronto, ONInterior AlterationsInspection7,010 d$15,000,000
851 Mount Pleasant Rd, Toronto, ONWindow ReplacementInspection6,902 d$11,000,000
255 Mc Caul St, Toronto, ONInterior AlterationsInspection6,821 d$10,600,000
399 Bathurst St, Toronto, ONMultiple ProjectsInspection6,954 d$8,000,000
48 Thorncliffe Park Dr, Toronto, ONMultiple ProjectsInspection6,847 d$6,500,000
1100 Lansdowne Ave, Toronto, ONInterior AlterationsInspection6,922 d$6,000,000
789 Yonge St, Toronto, ONAddition(s)Inspection6,789 d$6,000,000
1020 Martin Grove Rd, Toronto, ONMultiple ProjectsInspection7,091 d$5,750,000
931 College St, Toronto, ONMultiple ProjectsInspection7,136 d$4,200,000
60 Richview Rd, Toronto, ONInterior AlterationsInspection6,975 d$4,055,305
1130 Bathurst St, Toronto, ONInterior AlterationsInspection6,982 d$4,000,000
245 Markland Dr, Toronto, ONMultiple ProjectsInspection6,845 d$3,500,000
5102 Yonge St, Toronto, ONInterior AlterationsInspection7,035 d$3,400,000
3025 Finch Ave W, Toronto, ONNew BuildingInspection7,127 d$3,330,460

“Open” counts days from issue date to Jul 23, 2026. A permit remaining open does not by itself mean a project is abandoned; the City closes permits on final inspection, and some long-running projects are still legitimately active.

Track new Toronto permits the day they are issued. Historical pages show what is still open. Sign in free to see what was filed this morning.

Frequently asked questions

How many Toronto building permits from 2007 are still open?
4,708 permits issued in Toronto during 2007 were still in the City's active permit register. This is the count of permits that have not closed out, not the number of permits Toronto issued in 2007. The City issues roughly 30,000 to 40,000 permits a year, and closed permits are removed from the published file.
How long have Toronto's 2007 permits been open?
Half of the 4,708 still-open permits from 2007 have been open for at least 6,945 days (about 19 years), measured from issue date to Jul 23, 2026. One in ten has been open longer than 7,099 days (about 19 years). These are permits the City has not closed out, which can mean a long-running project, a stalled one, or one that was finished without being signed off.
How many 2007 Toronto permits were never started?
246 of the 4,708 surviving 2007 permits (5.2%) sit at a status indicating work has not visibly begun, such as "Permit Issued" or "Work Not Started". The approval was granted and the file shows no progression past it. The remainder are at inspection or revision stages.
Can I compare 2007 to other years?
No. Each year's count reflects how long its permits have had to close, so an older year showing fewer permits means more of them closed, not that less was built. Comparing 2007 to another year measures elapsed time rather than construction activity. Use the status and trade breakdowns within 2007 instead.