2006 permits

Toronto building permits from 2006: 4,422 are still open

Of the building permits Toronto issued in 2006, 4,422 remained in the City’s active permit register, and half of them have been open for at least 7,317 days (about 20 years).

This is not annual permit volume. The 2006 figures on this page count permits that are still openin the City of Toronto’s active permit register today. Permits drop out of that register once they close, so older years show fewer surviving records the further back you go. Toronto issues roughly 30,000 to 40,000 permits a year; the counts here are the unclosed remainder, and they cannot be compared between years as a trend.

Still open

4,422

Median time open

7,317 d

Median value

$55,000

Total value

$876,103,520

Value figures cover the 2,263 of 4,422 still-open 2006 permits that disclose an estimated construction cost. Medians, not averages: the cost distribution has a long tail and an average would overstate the typical permit.

What stage the 2006 permits are at

251 of them (5.7%) show no sign of work having begun: the permit was issued and the file has not moved past that point.

StatusPermitsShare
Inspection
3,722
84.2%
Revision Issued
446
10.1%
Permit Issued
183
4.1%
Work Not Started
66
1.5%
Ready for Issuance
2
0.0%
Revocation Pending
2
0.0%
Work Suspended
1
0.0%

Still-open 2006 permits by trade

TradePermitsTotal value
Addition1,291$164,516,515
Interior alteration791$153,863,493
New build698$430,414,982
Plumbing536$20,714,443
HVAC446$6,643,000
Other / unclassified227$12,227,975
Deck209$12,717,972
Window / Door83$3,992,700
Roofing74$27,580,440
Demolition53$42,271,000
Pool11$831,000
Electrical3$330,000

Neighbourhoods with the most open 2006 permits

RankNeighbourhoodOpen permitsTotal value
1Bedford Park-Nortown162$17,120,500
2Yonge-Bay Corridor158$109,311,993
3Leaside-Bennington120$9,099,800
4Rosedale-Moore Park112$9,639,800
5West Humber-Clairville98$50,438,675
6Lawrence Park South94$5,905,500
7Etobicoke City Centre88$37,996,000
8Runnymede-Bloor West Village84$7,202,000
9The Beaches84$2,629,000
10Stonegate-Queensway84$24,606,500
11South Riverdale81$4,360,000
12High Park-Swansea79$3,366,550
13Palmerston-Little Italy77$2,684,500
14Yorkdale-Glen Park75$29,944,040
15Englemount-Lawrence70$4,609,465
16North Riverdale68$1,973,000
17Annex67$3,633,000
18Downsview65$14,779,590
19Kingsway South63$3,996,000
20Kensington-Chinatown58$34,242,000

Top 20 neighbourhoods by open-permit count. Areas outside this list still have open 2006 permits.

Largest 2006 projects still open

The highest-value permits from 2006 that have not closed out, ranked by estimated construction cost.

AddressWorkStatusOpenValue
761 Bay St, Toronto, ONNew BuildingInspection7,380 d$65,000,000
21 Carlton St, Toronto, ONNew BuildingInspection7,365 d$45,000,000
1800 Sheppard Ave E, Toronto, ONInterior AlterationsInspection7,318 d$37,000,000
732 Spadina Ave, Toronto, ONNew BuildingInspection7,360 d$35,000,000
600 University Ave, Toronto, ONMultiple ProjectsInspection7,203 d$30,000,000
650 Fleet St, Toronto, ONNew BuildingInspection7,451 d$25,000,000
1050 The Queensway, Toronto, ONNew BuildingInspection7,420 d$21,000,000
700 Huron St, Toronto, ONMultiple ProjectsInspection7,217 d$21,000,000
3401 Dufferin St, Toronto, ONMultiple ProjectsInspection7,491 d$20,000,000
2170 Kipling Ave, Toronto, ONNew BuildingInspection7,286 d$20,000,000
130 The Queensway, Toronto, ONMultiple ProjectsInspection7,154 d$20,000,000
2250 Islington Ave, Toronto, ONAddition(s)Inspection7,164 d$18,000,000
75 Lemonwood Dr, Toronto, ONNew BuildingInspection7,504 d$17,700,000
2110 Dundas St E, Toronto, ONSite ServiceInspection7,465 d$15,000,000
299 Bloor St W, Toronto, ONNew BuildingInspection7,155 d$12,000,000
2549 Weston Rd, Toronto, ONNew BuildingInspection7,498 d$11,872,000
1050 The Queensway, Toronto, ONNew BuildingInspection7,420 d$11,000,000
205 New Toronto St, Toronto, ONNew BuildingInspection7,423 d$10,000,000
55 King St W, Toronto, ONInterior AlterationsInspection7,178 d$10,000,000
110 St George St, Toronto, ONAddition(s)Inspection7,471 d$9,250,000
1100 King St W, Toronto, ONNew BuildingInspection7,308 d$8,000,000
525 Bay St, Toronto, ONInterior AlterationsInspection7,184 d$8,000,000
920 Sheppard Ave W, Toronto, ONNew BuildingInspection7,160 d$8,000,000
150 Gerrard St W, Toronto, ONInterior AlterationsInspection7,196 d$6,809,440
2201 Finch Ave W, Toronto, ONInterior AlterationsInspection7,168 d$6,000,000

“Open” counts days from issue date to Jul 23, 2026. A permit remaining open does not by itself mean a project is abandoned; the City closes permits on final inspection, and some long-running projects are still legitimately active.

Track new Toronto permits the day they are issued. Historical pages show what is still open. Sign in free to see what was filed this morning.

Frequently asked questions

How many Toronto building permits from 2006 are still open?
4,422 permits issued in Toronto during 2006 were still in the City's active permit register. This is the count of permits that have not closed out, not the number of permits Toronto issued in 2006. The City issues roughly 30,000 to 40,000 permits a year, and closed permits are removed from the published file.
How long have Toronto's 2006 permits been open?
Half of the 4,422 still-open permits from 2006 have been open for at least 7,317 days (about 20 years), measured from issue date to Jul 23, 2026. One in ten has been open longer than 7,463 days (about 20 years). These are permits the City has not closed out, which can mean a long-running project, a stalled one, or one that was finished without being signed off.
How many 2006 Toronto permits were never started?
251 of the 4,422 surviving 2006 permits (5.7%) sit at a status indicating work has not visibly begun, such as "Permit Issued" or "Work Not Started". The approval was granted and the file shows no progression past it. The remainder are at inspection or revision stages.
Can I compare 2006 to other years?
No. Each year's count reflects how long its permits have had to close, so an older year showing fewer permits means more of them closed, not that less was built. Comparing 2006 to another year measures elapsed time rather than construction activity. Use the status and trade breakdowns within 2006 instead.