PermitIndex

2005 permits

Toronto building permits from 2005: 4,136 are still open

Of the building permits Toronto issued in 2005, 4,136 remained in the City’s active permit register, and half of them have been open for at least 7,680 days (about 21 years).

This is not annual permit volume. The 2005 figures on this page count permits that are still openin the City of Toronto’s active permit register today. Permits drop out of that register once they close, so older years show fewer surviving records the further back you go. Toronto issues roughly 30,000 to 40,000 permits a year; the counts here are the unclosed remainder, and they cannot be compared between years as a trend.

Still open

4,136

Median time open

7,680 d

Median value

$55,000

Total value

$1,476,563,394

Value figures cover the 2,217 of 4,136 still-open 2005 permits that disclose an estimated construction cost. Medians, not averages: the cost distribution has a long tail and an average would overstate the typical permit.

What stage the 2005 permits are at

304 of them (7.4%) show no sign of work having begun: the permit was issued and the file has not moved past that point.

StatusPermitsShare
Inspection
3,638
88.0%
Permit Issued
264
6.4%
Revision Issued
191
4.6%
Work Not Started
40
1.0%
Revocation Pending
3
0.1%

Still-open 2005 permits by trade

TradePermitsTotal value
Addition1,198$124,392,560
New build1,048$1,118,056,317
Interior alteration698$111,381,293
Plumbing364$5,315,400
HVAC254$3,563,400
Other / unclassified222$7,051,100
Deck159$4,456,700
Roofing71$4,466,329
Window / Door63$5,688,200
Demolition40$34,839,095
Pool16$56,582,000
Electrical3$771,000

Neighbourhoods with the most open 2005 permits

RankNeighbourhoodOpen permitsTotal value
1Stonegate-Queensway207$34,355,500
2Bedford Park-Nortown173$17,483,010
3South Riverdale160$5,405,070
4Yonge-Bay Corridor118$32,499,900
5Leaside-Bennington110$8,994,000
6Newtonbrook West110$58,120,700
7Rosedale-Moore Park101$14,261,050
8West Humber-Clairville87$30,487,000
9The Beaches77$16,020,100
10Lawrence Park South71$15,461,000
11High Park-Swansea67$1,907,600
12Moss Park63$2,205,500
13Greenwood-Coxwell59$1,559,000
14Annex59$76,836,500
15Islington59$30,482,400
16Willowdale West59$142,286,800
17Kensington-Chinatown58$52,807,953
18Yorkdale-Glen Park58$6,802,019
19Edenbridge-Humber Valley57$25,732,000
20Danforth East York55$2,186,000

Top 20 neighbourhoods by open-permit count. Areas outside this list still have open 2005 permits.

Largest 2005 projects still open

The highest-value permits from 2005 that have not closed out, ranked by estimated construction cost.

AddressWorkStatusOpenValue
25 Finch Ave W, Toronto, ONNew BuildingInspection7,518 d$64,000,000
650 Fleet St, Toronto, ONNew BuildingInspection7,702 d$61,436,100
5 Mariner Ter, Toronto, ONNew BuildingInspection7,870 d$56,000,000
18 Spring Garden Ave, Toronto, ONNew BuildingInspection7,525 d$47,500,000
15 Greenview Ave, Toronto, ONNew BuildingInspection7,517 d$44,000,000
385 Brunswick Ave, Toronto, ONNew BuildingInspection7,668 d$40,000,000
36 Whitewood Rd, Toronto, ONNew BuildingInspection7,541 d$40,000,000
60 Murray St, Toronto, ONNew BuildingInspection7,602 d$38,000,000
33 A Bay St, Toronto, ONNew BuildingInspection7,702 d$35,000,000
5566 Yonge St, Toronto, ONNew BuildingInspection7,519 d$33,000,000
5566 Yonge St, Toronto, ONNew BuildingInspection7,519 d$32,000,000
18 Kenaston Gdns, Toronto, ONNew BuildingInspection7,814 d$31,000,000
23 Brant St, Toronto, ONNew BuildingInspection7,695 d$31,000,000
120 Dallimore Crcl, Toronto, ONNew BuildingInspection7,511 d$29,980,000
363-369 Sorauren Ave, Toronto, ONNew BuildingInspection7,526 d$27,000,000
1005 King St W, Toronto, ONNew BuildingInspection7,716 d$25,000,000
9 Burnhamthorpe Cres, Toronto, ONNew BuildingInspection7,659 d$25,000,000
1379 Bloor St W, Toronto, ONNew BuildingInspection7,702 d$24,000,000
30 Fontenay Crt, Toronto, ONNew BuildingInspection7,854 d$21,000,000
1280 Bay St, Toronto, ONNew BuildingInspection7,526 d$20,800,000
1555 Jane St, Toronto, ONNew BuildingInspection7,751 d$20,000,000
43 Hanna Ave, Toronto, ONInterior AlterationsInspection7,524 d$20,000,000
5 Michael Power Pl, Toronto, ONNew BuildingInspection7,519 d$20,000,000
1 Michael Power Pl, Toronto, ONNew BuildingInspection7,519 d$20,000,000
3 Michael Power Pl, Toronto, ONNew BuildingInspection7,518 d$20,000,000

“Open” counts days from issue date to Jul 23, 2026. A permit remaining open does not by itself mean a project is abandoned; the City closes permits on final inspection, and some long-running projects are still legitimately active.

Track new Toronto permits the day they are issued. Historical pages show what is still open. Sign in free to see what was filed this morning.

Frequently asked questions

How many Toronto building permits from 2005 are still open?
4,136 permits issued in Toronto during 2005 were still in the City's active permit register. This is the count of permits that have not closed out, not the number of permits Toronto issued in 2005. The City issues roughly 30,000 to 40,000 permits a year, and closed permits are removed from the published file.
How long have Toronto's 2005 permits been open?
Half of the 4,136 still-open permits from 2005 have been open for at least 7,680 days (about 21 years), measured from issue date to Jul 23, 2026. One in ten has been open longer than 7,822 days (about 21 years). These are permits the City has not closed out, which can mean a long-running project, a stalled one, or one that was finished without being signed off.
How many 2005 Toronto permits were never started?
304 of the 4,136 surviving 2005 permits (7.4%) sit at a status indicating work has not visibly begun, such as "Permit Issued" or "Work Not Started". The approval was granted and the file shows no progression past it. The remainder are at inspection or revision stages.
Can I compare 2005 to other years?
No. Each year's count reflects how long its permits have had to close, so an older year showing fewer permits means more of them closed, not that less was built. Comparing 2005 to another year measures elapsed time rather than construction activity. Use the status and trade breakdowns within 2005 instead.

Other years