PermitIndex

2004 permits

Toronto building permits from 2004: 3,342 are still open

Of the building permits Toronto issued in 2004, 3,342 remained in the City’s active permit register, and half of them have been open for at least 8,043 days (about 22 years).

This is not annual permit volume. The 2004 figures on this page count permits that are still openin the City of Toronto’s active permit register today. Permits drop out of that register once they close, so older years show fewer surviving records the further back you go. Toronto issues roughly 30,000 to 40,000 permits a year; the counts here are the unclosed remainder, and they cannot be compared between years as a trend.

Still open

3,342

Median time open

8,043 d

Median value

$45,000

Total value

$1,284,538,062

Value figures cover the 1,763 of 3,342 still-open 2004 permits that disclose an estimated construction cost. Medians, not averages: the cost distribution has a long tail and an average would overstate the typical permit.

What stage the 2004 permits are at

302 of them (9.0%) show no sign of work having begun: the permit was issued and the file has not moved past that point.

StatusPermitsShare
Inspection
3,026
90.5%
Permit Issued
283
8.5%
Work Not Started
19
0.6%
Plan Review Complete
8
0.2%
Revocation Pending
2
0.1%
VIOLATION
2
0.1%
Work Suspended
2
0.1%

Still-open 2004 permits by trade

TradePermitsTotal value
Addition1,105$108,560,541
New build655$1,015,028,320
Interior alteration483$98,139,205
Plumbing304$8,899,500
Other / unclassified237$7,554,901
HVAC221$9,733,000
Deck172$5,307,095
Roofing67$10,972,400
Window / Door56$1,878,100
Demolition31$17,665,000
Pool11$800,000

Neighbourhoods with the most open 2004 permits

RankNeighbourhoodOpen permitsTotal value
1Bedford Park-Nortown101$9,795,600
2Stonegate-Queensway95$43,313,050
3Rosedale-Moore Park80$3,376,000
4Briar Hill-Belgravia77$12,508,760
5Leaside-Bennington74$5,375,500
6The Beaches73$5,142,220
7Etobicoke City Centre72$53,763,000
8South Riverdale71$24,386,650
9West Humber-Clairville70$13,763,300
10High Park-Swansea68$2,437,329
11Yonge-Bay Corridor61$91,396,000
12Newtonbrook West55$4,319,440
13Englemount-Lawrence54$4,409,000
14Lawrence Park South53$2,466,000
15Rockcliffe-Smythe53$1,092,500
16Yorkdale-Glen Park49$3,014,006
17Danforth East York42$832,001
18University42$214,879,500
19Annex42$61,874,000
20Palmerston-Little Italy41$1,604,500

Top 20 neighbourhoods by open-permit count. Areas outside this list still have open 2004 permits.

Largest 2004 projects still open

The highest-value permits from 2004 that have not closed out, ranked by estimated construction cost.

AddressWorkStatusOpenValue
100 Queen'S Park, Toronto, ONMultiple ProjectsInspection8,056 d$90,000,000
150 College St, Toronto, ONNew BuildingInspection8,028 d$60,000,000
101 College St, Toronto, ONNew BuildingInspection8,087 d$58,000,000
860 Yonge St, Toronto, ONNew BuildingInspection8,058 d$55,000,000
32 Kenaston Gdns, Toronto, ONNew BuildingInspection8,119 d$49,128,000
180 Queen St W, Toronto, ONNew BuildingInspection8,024 d$49,000,000
23 Hollywood Ave, Toronto, ONNew BuildingInspection8,165 d$48,747,810
150 College St, Toronto, ONNew BuildingPermit Issued7,919 d$45,000,000
650 Fleet St, Toronto, ONNew BuildingInspection8,198 d$42,000,000
2701 Queen St E, Toronto, ONNew BuildingInspection8,093 d$40,000,000
438 King St W, Toronto, ONNew BuildingInspection7,940 d$32,000,000
7 Michael Power Pl, Toronto, ONNew BuildingInspection8,121 d$30,000,000
905 Bay St, Toronto, ONNew BuildingInspection8,003 d$30,000,000
1005 King St W, Toronto, ONNew BuildingInspection7,909 d$30,000,000
27 Bales Ave, Toronto, ONNew BuildingInspection8,000 d$28,765,000
27 Bales Ave, Toronto, ONNew BuildingInspection8,000 d$28,765,000
946 Lawrence Ave E, Toronto, ONNew BuildingInspection8,136 d$27,000,000
38 William Carson Cres, Toronto, ONNew BuildingInspection8,116 d$23,000,000
68 Broadview Ave, Toronto, ONMultiple ProjectsInspection7,931 d$23,000,000
2845 Bloor St W, Toronto, ONNew BuildingInspection8,022 d$20,000,000
70 High Park Ave, Toronto, ONNew BuildingInspection8,015 d$20,000,000
73 St George St, Toronto, ONNew BuildingPermit Issued7,889 d$17,000,000
3792 Bathurst St, Toronto, ONNew BuildingInspection8,087 d$15,000,000
81 Resources Rd, Toronto, ONInterior AlterationsInspection7,953 d$15,000,000
2877 Bayview Ave, Toronto, ONAddition(s)Inspection8,071 d$14,036,000

“Open” counts days from issue date to Jul 23, 2026. A permit remaining open does not by itself mean a project is abandoned; the City closes permits on final inspection, and some long-running projects are still legitimately active.

Track new Toronto permits the day they are issued. Historical pages show what is still open. Sign in free to see what was filed this morning.

Frequently asked questions

How many Toronto building permits from 2004 are still open?
3,342 permits issued in Toronto during 2004 were still in the City's active permit register. This is the count of permits that have not closed out, not the number of permits Toronto issued in 2004. The City issues roughly 30,000 to 40,000 permits a year, and closed permits are removed from the published file.
How long have Toronto's 2004 permits been open?
Half of the 3,342 still-open permits from 2004 have been open for at least 8,043 days (about 22 years), measured from issue date to Jul 23, 2026. One in ten has been open longer than 8,183 days (about 22 years). These are permits the City has not closed out, which can mean a long-running project, a stalled one, or one that was finished without being signed off.
How many 2004 Toronto permits were never started?
302 of the 3,342 surviving 2004 permits (9.0%) sit at a status indicating work has not visibly begun, such as "Permit Issued" or "Work Not Started". The approval was granted and the file shows no progression past it. The remainder are at inspection or revision stages.
Can I compare 2004 to other years?
No. Each year's count reflects how long its permits have had to close, so an older year showing fewer permits means more of them closed, not that less was built. Comparing 2004 to another year measures elapsed time rather than construction activity. Use the status and trade breakdowns within 2004 instead.

Other years