Toronto building permits from 2015: 7,070 are still open

Of the building permits Toronto issued in 2015, 7,070 remained in the City’s active permit register, and half of them have been open for at least 4,028 days (about 11 years).

This is not annual permit volume. The 2015 figures on this page count permits that are still openin the City of Toronto’s active permit register today. Permits drop out of that register once they close, so older years show fewer surviving records the further back you go. Toronto issues roughly 30,000 to 40,000 permits a year; the counts here are the unclosed remainder, and they cannot be compared between years as a trend.

Still open

7,070

Median time open

4,028 d

Median value

$50,000

Total value

$3,544,711,161

Value figures cover the 3,613 of 7,070 still-open 2015 permits that disclose an estimated construction cost. Medians, not averages: the cost distribution has a long tail and an average would overstate the typical permit.

What stage the 2015 permits are at

1,208 of them (17.1%) show no sign of work having begun: the permit was issued and the file has not moved past that point.

StatusPermitsShare
Inspection
4,933
69.8%
Permit Issued
1,169
16.5%
Revision Issued
718
10.2%
Revocation Pending
210
3.0%
Work Not Started
39
0.6%
Work Suspended
1
0.0%

Still-open 2015 permits by trade

TradePermitsTotal value
Plumbing1,473$44,476,007
Interior alteration1,349$471,965,826
Addition1,295$216,131,800
HVAC895$24,809,511
New build773$2,368,851,314
Other / unclassified412$30,043,593
Deck344$29,509,381
Roofing190$56,139,337
Window / Door161$28,166,348
Demolition143$201,458,837
Pool27$71,947,000
Electrical8$1,212,207

Neighbourhoods with the most open 2015 permits

RankNeighbourhoodOpen permitsTotal value
1Yonge-Bay Corridor225$50,916,195
2Kensington-Chinatown219$71,375,500
3South Riverdale196$105,025,500
4West Humber-Clairville166$20,050,749
5Etobicoke City Centre155$67,815,665
6High Park-Swansea130$5,936,750
7Wellington Place127$105,379,290
8Annex124$30,021,107
9Rosedale-Moore Park120$17,408,260
10Stonegate-Queensway109$11,980,000
11Yorkdale-Glen Park105$38,567,152
12Roncesvalles99$19,413,700
13Wexford/Maryvale95$3,889,000
14York University Heights93$23,696,770
15West Hill92$15,712,383
16Birchcliffe-Cliffside88$6,356,125
17Downtown Yonge East84$68,544,753
18Lawrence Park South78$8,211,900
19Junction Area78$5,179,000
20The Beaches78$4,541,000

Top 20 neighbourhoods by open-permit count. Areas outside this list still have open 2015 permits.

Largest 2015 projects still open

The highest-value permits from 2015 that have not closed out, ranked by estimated construction cost.

AddressWorkStatusOpenValue
1201 Wilson Ave, Toronto, ONNew BuildingPermit Issued4,112 d$765,000,000
90 Harbour St, Toronto, ONNew BuildingInspection3,993 d$250,000,000
85 Eglinton Ave E, Toronto, ONNew BuildingInspection3,866 d$178,000,000
511 Bremner Blvd, Toronto, ONNew BuildingInspection4,110 d$128,000,000
2 Strachan Ave, Toronto, ONMultiple ProjectsInspection4,097 d$105,000,000
2 Lisgar St, Toronto, ONNew BuildingInspection4,144 d$100,000,000
955 Bay St, Toronto, ONOther(BA)Inspection3,874 d$100,000,000
55 Ann O'Reilly Rd, Toronto, ONNew BuildingInspection4,123 d$97,000,000
30 Roehampton Ave, Toronto, ONNew BuildingInspection4,118 d$95,000,000
621 King St W, Toronto, ONNew BuildingInspection3,908 d$67,000,000
345 Carlaw Ave, Toronto, ONNew BuildingInspection4,207 d$60,000,000
1000 Bay St, Toronto, ONNew BuildingInspection4,038 d$60,000,000
11 Peel Ave, Toronto, ONNew BuildingInspection3,996 d$60,000,000
61 Front St W, Toronto, ONMultiple ProjectsInspection4,178 d$50,000,000
9 Valhalla Inn Rd, Toronto, ONNew BuildingInspection4,011 d$50,000,000
252 Victoria St, Toronto, ONNew BuildingInspection3,986 d$49,970,000
571 Jarvis St, Toronto, ONMultiple ProjectsInspection3,887 d$36,000,000
434 Adelaide St W, Toronto, ONNew BuildingInspection4,006 d$30,000,000
20 Gladstone Ave, Toronto, ONNew BuildingInspection3,942 d$30,000,000
130 Dunn Ave, Toronto, ONInterior AlterationsInspection3,944 d$29,000,000
777 Dundas St E, Toronto, ONNew BuildingInspection4,178 d$26,000,000
15 Beverley St, Toronto, ONNew BuildingInspection4,049 d$25,000,000
301 St Clair Ave W, Toronto, ONMultiple ProjectsPermit Issued3,908 d$25,000,000
68 Merton St, Toronto, ONNew BuildingInspection4,017 d$24,446,600
298 Lonsdale Rd, Toronto, ONMultiple ProjectsInspection3,943 d$24,000,000

“Open” counts days from issue date to Jul 23, 2026. A permit remaining open does not by itself mean a project is abandoned; the City closes permits on final inspection, and some long-running projects are still legitimately active.

Track new Toronto permits the day they are issued. Historical pages show what is still open. Sign in free to see what was filed this morning.

Frequently asked questions

How many Toronto building permits from 2015 are still open?
7,070 permits issued in Toronto during 2015 were still in the City's active permit register. This is the count of permits that have not closed out, not the number of permits Toronto issued in 2015. The City issues roughly 30,000 to 40,000 permits a year, and closed permits are removed from the published file.
How long have Toronto's 2015 permits been open?
Half of the 7,070 still-open permits from 2015 have been open for at least 4,028 days (about 11 years), measured from issue date to Jul 23, 2026. One in ten has been open longer than 4,173 days (about 11 years). These are permits the City has not closed out, which can mean a long-running project, a stalled one, or one that was finished without being signed off.
How many 2015 Toronto permits were never started?
1,208 of the 7,070 surviving 2015 permits (17.1%) sit at a status indicating work has not visibly begun, such as "Permit Issued" or "Work Not Started". The approval was granted and the file shows no progression past it. The remainder are at inspection or revision stages.
Can I compare 2015 to other years?
No. Each year's count reflects how long its permits have had to close, so an older year showing fewer permits means more of them closed, not that less was built. Comparing 2015 to another year measures elapsed time rather than construction activity. Use the status and trade breakdowns within 2015 instead.

Other years