Toronto building permits from 2014: 6,476 are still open

Of the building permits Toronto issued in 2014, 6,476 remained in the City’s active permit register, and half of them have been open for at least 4,395 days (about 12 years).

This is not annual permit volume. The 2014 figures on this page count permits that are still openin the City of Toronto’s active permit register today. Permits drop out of that register once they close, so older years show fewer surviving records the further back you go. Toronto issues roughly 30,000 to 40,000 permits a year; the counts here are the unclosed remainder, and they cannot be compared between years as a trend.

Still open

6,476

Median time open

4,395 d

Median value

$50,000

Total value

$2,827,785,089

Value figures cover the 3,292 of 6,476 still-open 2014 permits that disclose an estimated construction cost. Medians, not averages: the cost distribution has a long tail and an average would overstate the typical permit.

What stage the 2014 permits are at

1,077 of them (16.6%) show no sign of work having begun: the permit was issued and the file has not moved past that point.

StatusPermitsShare
Inspection
4,603
71.1%
Permit Issued
1,036
16.0%
Revision Issued
676
10.4%
Revocation Pending
120
1.9%
Work Not Started
41
0.6%

Still-open 2014 permits by trade

TradePermitsTotal value
Interior alteration1,310$255,913,281
Plumbing1,200$35,188,556
Addition1,173$158,493,762
HVAC919$37,747,174
New build672$2,223,016,617
Other / unclassified382$19,714,213
Deck341$37,962,533
Roofing205$23,387,933
Window / Door120$15,854,100
Demolition108$17,065,100
Pool33$1,761,120
Electrical13$1,680,700

Neighbourhoods with the most open 2014 permits

RankNeighbourhoodOpen permitsTotal value
1Yonge-Bay Corridor206$20,136,763
2Rosedale-Moore Park157$23,158,900
3Annex147$45,302,976
4South Riverdale138$7,783,405
5Wellington Place137$264,288,371
6High Park-Swansea137$123,886,050
7West Humber-Clairville135$56,059,352
8Etobicoke City Centre111$12,964,300
9Kensington-Chinatown109$25,270,452
10Banbury-Don Mills105$24,867,120
11Yorkdale-Glen Park103$10,072,880
12Stonegate-Queensway98$9,872,601
13Bedford Park-Nortown91$13,006,608
14Roncesvalles88$4,232,500
15Greenwood-Coxwell86$8,377,550
16Junction Area82$5,121,198
17Trinity-Bellwoods82$125,694,000
18High Park North79$94,321,000
19The Beaches77$4,349,000
20Wexford/Maryvale76$4,405,400

Top 20 neighbourhoods by open-permit count. Areas outside this list still have open 2014 permits.

Largest 2014 projects still open

The highest-value permits from 2014 that have not closed out, ranked by estimated construction cost.

AddressWorkStatusOpenValue
1 Bloor St E, Toronto, ONNew BuildingInspection4,229 d$220,000,000
5162 Yonge St, Toronto, ONNew BuildingInspection4,388 d$200,000,000
2 Strachan Ave, Toronto, ONNew BuildingInspection4,336 d$180,000,000
25 Rees St, Toronto, ONNew BuildingInspection4,409 d$110,000,000
217 Manning Ave, Toronto, ONNew BuildingInspection4,542 d$100,000,000
5168 Yonge St, Toronto, ONNew BuildingInspection4,389 d$100,000,000
1844 Bloor St W, Toronto, ONNew BuildingInspection4,558 d$90,000,000
2157 Lake Shore Blvd W, Toronto, ONNew BuildingInspection4,270 d$85,000,000
5 St Joseph St, Toronto, ONNew BuildingInspection4,390 d$80,740,000
2490 Bloor St W, Toronto, ONNew BuildingInspection4,493 d$80,000,000
318 Richmond St W, Toronto, ONNew BuildingInspection4,340 d$75,000,000
60 John St, Toronto, ONNew BuildingInspection4,425 d$66,000,000
310 Tweedsmuir Ave, Toronto, ONNew BuildingInspection4,501 d$55,000,000
0 Bonis Ave, Toronto, ONNew BuildingInspection4,277 d$50,899,355
25 Fontenay Crt, Toronto, ONNew BuildingInspection4,530 d$50,000,000
290 Adelaide St W, Toronto, ONNew BuildingInspection4,399 d$50,000,000
203-205 Humber College Blvd, Toronto, ONNew BuildingInspection4,391 d$46,515,800
2200 Lake Shore Blvd W, Toronto, ONNew BuildingInspection4,508 d$40,000,000
2055 Danforth Ave, Toronto, ONNew BuildingInspection4,286 d$40,000,000
66 Isabella St, Toronto, ONNew BuildingInspection4,558 d$38,000,000
58 Orchard View Blvd, Toronto, ONNew BuildingInspection4,560 d$36,300,000
11 Charlotte St, Toronto, ONNew BuildingInspection4,378 d$33,000,000
130 George Henry Blvd, Toronto, ONNew BuildingInspection4,458 d$30,000,000
164 Avenue Rd, Toronto, ONNew BuildingInspection4,437 d$30,000,000
2233 Kipling Ave, Toronto, ONNew BuildingInspection4,236 d$26,634,600

“Open” counts days from issue date to Jul 23, 2026. A permit remaining open does not by itself mean a project is abandoned; the City closes permits on final inspection, and some long-running projects are still legitimately active.

Track new Toronto permits the day they are issued. Historical pages show what is still open. Sign in free to see what was filed this morning.

Frequently asked questions

How many Toronto building permits from 2014 are still open?
6,476 permits issued in Toronto during 2014 were still in the City's active permit register. This is the count of permits that have not closed out, not the number of permits Toronto issued in 2014. The City issues roughly 30,000 to 40,000 permits a year, and closed permits are removed from the published file.
How long have Toronto's 2014 permits been open?
Half of the 6,476 still-open permits from 2014 have been open for at least 4,395 days (about 12 years), measured from issue date to Jul 23, 2026. One in ten has been open longer than 4,550 days (about 12 years). These are permits the City has not closed out, which can mean a long-running project, a stalled one, or one that was finished without being signed off.
How many 2014 Toronto permits were never started?
1,077 of the 6,476 surviving 2014 permits (16.6%) sit at a status indicating work has not visibly begun, such as "Permit Issued" or "Work Not Started". The approval was granted and the file shows no progression past it. The remainder are at inspection or revision stages.
Can I compare 2014 to other years?
No. Each year's count reflects how long its permits have had to close, so an older year showing fewer permits means more of them closed, not that less was built. Comparing 2014 to another year measures elapsed time rather than construction activity. Use the status and trade breakdowns within 2014 instead.