2002 permits

Toronto building permits from 2002: 1,930 are still open

Of the building permits Toronto issued in 2002, 1,930 remained in the City’s active permit register, and half of them have been open for at least 8,763 days (about 24 years).

This is not annual permit volume. The 2002 figures on this page count permits that are still openin the City of Toronto’s active permit register today. Permits drop out of that register once they close, so older years show fewer surviving records the further back you go. Toronto issues roughly 30,000 to 40,000 permits a year; the counts here are the unclosed remainder, and they cannot be compared between years as a trend.

Still open

1,930

Median time open

8,763 d

Median value

$60,000

Total value

$486,265,382

Value figures cover the 1,266 of 1,930 still-open 2002 permits that disclose an estimated construction cost. Medians, not averages: the cost distribution has a long tail and an average would overstate the typical permit.

What stage the 2002 permits are at

308 of them (16.0%) show no sign of work having begun: the permit was issued and the file has not moved past that point.

StatusPermitsShare
Inspection
1,607
83.3%
Permit Issued
300
15.5%
Work Not Started
8
0.4%
Order Complied
6
0.3%
VIOLATION
4
0.2%
Order Issued
2
0.1%
Plan Review Complete
1
0.1%
Revision Issued
1
0.1%
Revocation Pending
1
0.1%

Still-open 2002 permits by trade

TradePermitsTotal value
Addition501$91,799,169
New build458$290,869,049
Interior alteration303$73,658,300
Plumbing171$1,050,665
Other / unclassified156$6,694,900
HVAC137$468,600
Deck96$4,251,000
Roofing48$11,220,400
Window / Door33$1,398,800
Demolition24$4,629,500
Electrical2$205,000
Pool1$20,000

Neighbourhoods with the most open 2002 permits

RankNeighbourhoodOpen permitsTotal value
1Rosedale-Moore Park86$41,067,000
2Junction-Wallace Emerson65$6,472,000
3The Beaches62$3,020,800
4Etobicoke City Centre48$8,095,700
5Palmerston-Little Italy47$1,297,500
6Edenbridge-Humber Valley43$1,653,000
7Kingsway South41$1,591,254
8South Riverdale40$2,236,500
9Stonegate-Queensway38$4,011,000
10High Park North37$2,582,000
11Junction Area35$2,288,000
12O'Connor-Parkview34$3,346,000
13Lansing-Westgate33$21,925,072
14Trinity-Bellwoods32$866,000
15High Park-Swansea30$1,302,000
16Willowridge-Martingrove-Richview29$2,421,012
17Dovercourt Village28$2,101,000
18Playter Estates-Danforth27$1,124,500
19Woodbine Corridor27$865,000
20Newtonbrook East26$3,431,200

Top 20 neighbourhoods by open-permit count. Areas outside this list still have open 2002 permits.

Largest 2002 projects still open

The highest-value permits from 2002 that have not closed out, ranked by estimated construction cost.

AddressWorkStatusOpenValue
8 York St, Toronto, ONNew BuildingInspection8,861 d$50,000,000
8 York St, Toronto, ONNew BuildingInspection8,667 d$35,000,000
1 Ibms Etobicoke, Toronto, ONNew BuildingInspection8,848 d$33,030,000
18 Parkview Ave, Toronto, ONNew BuildingInspection8,801 d$30,000,000
205 Humber College Blvd, Toronto, ONNew BuildingInspection8,795 d$24,170,000
354 Wellington St W, Toronto, ONNew BuildingPermit Issued8,884 d$20,000,000
101 College St, Toronto, ONAddition(s)Inspection8,820 d$20,000,000
160 Kendal Ave, Toronto, ONAddition(s)Inspection8,630 d$20,000,000
321 Bloor St W, Toronto, ONPartial Permit - OtherInspection8,631 d$8,000,000
1750 Finch Ave E, Toronto, ONInterior AlterationsPermit Issued8,710 d$7,000,000
1435 Royal York Rd, Toronto, ONNew BuildingInspection8,731 d$6,466,000
500 University Ave, Toronto, ONMultiple ProjectsInspection8,910 d$6,000,000
1745 Eglinton Ave W, Toronto, ONNew BuildingInspection8,871 d$5,000,000
2365 Bayview Ave, Toronto, ONAddition(s)Inspection8,645 d$5,000,000
2300 Yonge St, Toronto, ONGarage Repair/ReconstructionInspection8,906 d$4,700,000
45 Lisgar St, Toronto, ONNew BuildingInspection8,759 d$4,500,000
363 Rogers Rd, Toronto, ONMultiple ProjectsInspection8,722 d$4,200,000
33 Willcocks St, Toronto, ONMultiple ProjectsInspection8,966 d$4,000,000
130 Overlea Blvd, Toronto, ONAddition/Alteration to Existing BuildingPermit Issued8,877 d$3,821,950
1 Ibms North York, Toronto, ONPartial Permit - FoundationInspection8,940 d$3,740,000
115 Scarsdale Rd, Toronto, ONInterior AlterationsPermit Issued8,864 d$3,500,000
2 Sheppard Sq, Toronto, ONNew BuildingPermit Issued8,647 d$3,070,000
1121 Yonge St, Toronto, ONInterior AlterationsInspection8,749 d$3,000,000
267 Victoria St, Toronto, ONNew BuildingInspection8,728 d$3,000,000
100 Queen'S Park, Toronto, ONInterior AlterationsInspection8,620 d$3,000,000

“Open” counts days from issue date to Jul 23, 2026. A permit remaining open does not by itself mean a project is abandoned; the City closes permits on final inspection, and some long-running projects are still legitimately active.

Track new Toronto permits the day they are issued. Historical pages show what is still open. Sign in free to see what was filed this morning.

Frequently asked questions

How many Toronto building permits from 2002 are still open?
1,930 permits issued in Toronto during 2002 were still in the City's active permit register. This is the count of permits that have not closed out, not the number of permits Toronto issued in 2002. The City issues roughly 30,000 to 40,000 permits a year, and closed permits are removed from the published file.
How long have Toronto's 2002 permits been open?
Half of the 1,930 still-open permits from 2002 have been open for at least 8,763 days (about 24 years), measured from issue date to Jul 23, 2026. One in ten has been open longer than 8,907 days (about 24 years). These are permits the City has not closed out, which can mean a long-running project, a stalled one, or one that was finished without being signed off.
How many 2002 Toronto permits were never started?
308 of the 1,930 surviving 2002 permits (16.0%) sit at a status indicating work has not visibly begun, such as "Permit Issued" or "Work Not Started". The approval was granted and the file shows no progression past it. The remainder are at inspection or revision stages.
Can I compare 2002 to other years?
No. Each year's count reflects how long its permits have had to close, so an older year showing fewer permits means more of them closed, not that less was built. Comparing 2002 to another year measures elapsed time rather than construction activity. Use the status and trade breakdowns within 2002 instead.