Toronto building permits from 2001: 1,237 are still open

Of the building permits Toronto issued in 2001, 1,237 remained in the City’s active permit register, and half of them have been open for at least 9,141 days (about 25 years).

This is not annual permit volume. The 2001 figures on this page count permits that are still openin the City of Toronto’s active permit register today. Permits drop out of that register once they close, so older years show fewer surviving records the further back you go. Toronto issues roughly 30,000 to 40,000 permits a year; the counts here are the unclosed remainder, and they cannot be compared between years as a trend.

Still open

1,237

Median time open

9,141 d

Median value

$32,000

Total value

$580,162,593

Value figures cover the 881 of 1,237 still-open 2001 permits that disclose an estimated construction cost. Medians, not averages: the cost distribution has a long tail and an average would overstate the typical permit.

What stage the 2001 permits are at

197 of them (15.9%) show no sign of work having begun: the permit was issued and the file has not moved past that point.

StatusPermitsShare
Inspection
1,033
83.5%
Permit Issued
194
15.7%
Work Not Started
3
0.2%
Order Complied
2
0.2%
Revocation Pending
2
0.2%
VIOLATION
2
0.2%
Order Issued
1
0.1%

Still-open 2001 permits by trade

TradePermitsTotal value
Addition337$110,074,052
Interior alteration223$26,352,700
New build215$410,941,992
Plumbing115$304,500
HVAC111$6,139,800
Other / unclassified74$8,461,601
Deck71$730,650
Roofing48$11,375,600
Window / Door28$2,198,000
Demolition12$3,213,698
Pool3$370,000

Neighbourhoods with the most open 2001 permits

RankNeighbourhoodOpen permitsTotal value
1Junction-Wallace Emerson48$4,177,500
2Rosedale-Moore Park43$48,011,300
3South Riverdale41$781,200
4The Beaches38$1,823,800
5Woodbine Corridor33$457,400
6North Riverdale31$728,500
7Palmerston-Little Italy28$620,000
8Little Portugal26$416,000
9Yonge-Bay Corridor26$83,759,000
10Stonegate-Queensway25$1,721,150
11Runnymede-Bloor West Village24$395,700
12Willowdale West23$23,883,000
13Greenwood-Coxwell22$1,594,900
14Dovercourt Village21$606,500
15Edenbridge-Humber Valley21$2,309,621
16Bedford Park-Nortown21$4,672,600
17Danforth20$318,000
18West Queen West20$506,000
19High Park North19$659,000
20Danforth East York17$186,500

Top 20 neighbourhoods by open-permit count. Areas outside this list still have open 2001 permits.

Largest 2001 projects still open

The highest-value permits from 2001 that have not closed out, ranked by estimated construction cost.

AddressWorkStatusOpenValue
101 College St, Toronto, ONAddition to Existing BuildingInspection9,038 d$80,000,000
20 Olive Ave, Toronto, ONNew BuildingInspection8,970 d$80,000,000
210 Victoria St, Toronto, ONNew BuildingInspection9,191 d$55,517,121
1 Ibms North York, Toronto, ONNew BuildingPermit Issued9,037 d$49,000,000
230 Wellington St W, Toronto, ONNew BuildingInspection9,211 d$40,000,000
300 Bloor St E, Toronto, ONNew BuildingInspection9,206 d$25,000,000
30 Harrison Garden Blvd, Toronto, ONNew BuildingInspection9,256 d$24,628,759
20 Scrivener Sq, Toronto, ONNew BuildingInspection9,284 d$20,000,000
7 Lorraine Dr, Toronto, ONNew BuildingInspection9,024 d$20,000,000
400 The West Mall, Toronto, ONNew BuildingInspection8,981 d$16,292,000
415 Jarvis St, Toronto, ONNew BuildingInspection9,298 d$10,000,000
730 Mount Pleasant Rd, Toronto, ONNew BuildingInspection9,141 d$10,000,000
16 Byng Ave, Toronto, ONNew BuildingInspection8,970 d$10,000,000
150 College St, Toronto, ONAddition(s)Inspection9,046 d$9,000,000
210 Victoria St, Toronto, ONFixtures/Roof Drains: OtherInspection9,190 d$6,000,000
1801 Bayview Ave, Toronto, ONNew BuildingInspection9,015 d$6,000,000
1 Ibms North York, Toronto, ONPartial Permit - FoundationInspection9,267 d$4,510,000
121 Bloor St E, Toronto, ONInterior AlterationsInspection9,173 d$4,000,000
210 Victoria St, Toronto, ONHVAC: Other Group C BuildingsInspection9,061 d$4,000,000
2365 Bayview Ave, Toronto, ONNew BuildingInspection9,178 d$2,100,000
40 King St W, Toronto, ONAlteration to Existing BuildingInspection9,269 d$2,000,000
21 Mc Gill St, Toronto, ONAlteration to Existing BuildingInspection9,212 d$2,000,000
3389 Steeles Ave E, Toronto, ONInterior AlterationsInspection9,102 d$2,000,000
1 Ibms North York, Toronto, ONNew BuildingInspection9,157 d$1,990,800
1 Ibms North York, Toronto, ONNew BuildingInspection9,157 d$1,925,700

“Open” counts days from issue date to Jul 23, 2026. A permit remaining open does not by itself mean a project is abandoned; the City closes permits on final inspection, and some long-running projects are still legitimately active.

Track new Toronto permits the day they are issued. Historical pages show what is still open. Sign in free to see what was filed this morning.

Frequently asked questions

How many Toronto building permits from 2001 are still open?
1,237 permits issued in Toronto during 2001 were still in the City's active permit register. This is the count of permits that have not closed out, not the number of permits Toronto issued in 2001. The City issues roughly 30,000 to 40,000 permits a year, and closed permits are removed from the published file.
How long have Toronto's 2001 permits been open?
Half of the 1,237 still-open permits from 2001 have been open for at least 9,141 days (about 25 years), measured from issue date to Jul 23, 2026. One in ten has been open longer than 9,277 days (about 25 years). These are permits the City has not closed out, which can mean a long-running project, a stalled one, or one that was finished without being signed off.
How many 2001 Toronto permits were never started?
197 of the 1,237 surviving 2001 permits (15.9%) sit at a status indicating work has not visibly begun, such as "Permit Issued" or "Work Not Started". The approval was granted and the file shows no progression past it. The remainder are at inspection or revision stages.
Can I compare 2001 to other years?
No. Each year's count reflects how long its permits have had to close, so an older year showing fewer permits means more of them closed, not that less was built. Comparing 2001 to another year measures elapsed time rather than construction activity. Use the status and trade breakdowns within 2001 instead.

Other years