2025 permits

Toronto building permits from 2025: 20,487 are still open

Of the building permits Toronto issued in 2025, 20,487 remained in the City’s active permit register as of Oct 18, 2026, and half of them have been open for at least 450 days (about 1 year).

This is not annual permit volume. The 2025 figures on this page count permits that are still openin the City of Toronto’s active permit register today. Permits drop out of that register once they close, so older years show fewer surviving records the further back you go. Toronto issues roughly 40,000 permits a year; the counts here are the unclosed remainder, and they cannot be compared between years as a trend.

Still open

20,487

Median time open

450 d

Median value

$100,000

Total value

$11,937,847,184

Value figures cover the 7,705 of 20,487 still-open 2025 permits that disclose an estimated construction cost. Medians, not averages: the cost distribution has a long tail and an average would overstate the typical permit.

What stage the 2025 permits are at

5,516 of them (26.9%) show no sign of work having begun: the permit was issued and the file has not moved past that point.

StatusPermitsShare
Inspection
12,311
60.1%
Permit Issued
5,437
26.5%
Revision Issued
2,600
12.7%
Work Not Started
71
0.3%
Revocation Pending
55
0.3%
Ready for Issuance
8
0.0%
Request Received
1
0.0%
Extension Granted
1
0.0%
Application On Hold
1
0.0%
Response Received
1
0.0%
Under Review
1
0.0%

Still-open 2025 permits by trade

TradePermitsTotal value
Plumbing4,500$604,418,040
Addition3,741$672,845,917
HVAC2,705$598,603,207
Interior alteration2,650$1,700,954,423
New build2,483$7,145,865,898
Other / unclassified1,267$85,616,844
Demolition1,074$312,897,201
Deck1,032$124,255,611
Window / Door448$35,404,472
Roofing365$143,815,946
Pool165$457,405,000
Electrical57$55,764,625

Neighbourhoods with the most open 2025 permits

RankNeighbourhoodOpen permitsTotal value
1Yonge-Bay Corridor549$280,598,610
2Annex493$725,630,165
3Banbury-Don Mills468$56,010,278
4Rosedale-Moore Park359$76,439,070
5South Riverdale350$378,224,854
6Englemount-Lawrence340$103,200,217
7Stonegate-Queensway336$308,547,352
8Edenbridge-Humber Valley316$63,318,924
9St Lawrence-East Bayfront-The Islands298$889,597,515
10West Humber-Clairville287$161,787,906
11Birchcliffe-Cliffside283$90,787,211
12High Park-Swansea272$103,420,785
13Bedford Park-Nortown265$48,383,502
14Trinity-Bellwoods242$19,501,500
15Kensington-Chinatown228$559,783,864
16Mimico-Queensway225$52,868,175
17Oakwood Village225$20,041,000
18Willowdale West224$18,339,000
19Clairlea-Birchmount223$40,423,127
20Alderwood223$28,344,000

Top 20 neighbourhoods by open-permit count. Areas outside this list still have open 2025 permits.

Largest 2025 projects still open

The highest-value permits from 2025 that have not closed out, ranked by estimated construction cost.

AddressWorkStatusOpenValue
50 Cumberland St, Toronto, ONNew BuildingRevision Issued353 d$440,000,000
3741-3751 Bloor St W, Toronto, ONNew BuildingInspection536 d$400,000,000
266 King St W, Toronto, ONNew BuildingInspection566 d$230,000,000
1 Delisle Ave, Toronto, ONNew BuildingInspection398 d$200,000,000
325 Gerrard St E, Toronto, ONShoringInspection324 d$200,000,000
1555 Queen St E, Toronto, ONNew BuildingInspection543 d$190,000,000
1245 Dupont St, Toronto, ONNew BuildingInspection311 d$190,000,000
25 St Dennis Dr, Toronto, ONNew BuildingInspection550 d$185,000,000
446 Lakeshore Ave, Toronto, ONNew BuildingPermit Issued373 d$185,000,000
6 Tippett Rd, Toronto, ONNew BuildingInspection444 d$176,636,000
162 Queens Quay E, Toronto, ONNew BuildingInspection444 d$170,000,000
1001 Queen St W, Toronto, ONNew BuildingInspection367 d$159,000,000
399 Bathurst St, Toronto, ONNew BuildingInspection424 d$152,310,000
63 Montclair Ave, Toronto, ONNew BuildingInspection460 d$150,000,000
30 Merton St, Toronto, ONNew BuildingInspection377 d$150,000,000
9 Leslie St, Toronto, ONNew BuildingPermit Issued324 d$143,626,807
2490-2504 Yonge St, Toronto, ONNew BuildingInspection599 d$142,242,800
801 The Queensway, Toronto, ONInside and Outside DrainsInspection503 d$140,000,000
5251 Dundas St W, Toronto, ONNew BuildingInspection523 d$132,915,000
55 Eastern Ave, Toronto, ONNew BuildingInspection507 d$120,000,000
1156 The Queensway, Toronto, ONNew BuildingInspection291 d$118,000,000
80 Scottfield Dr, Toronto, ONNew BuildingInspection402 d$110,000,000
3450 Dufferin St, Toronto, ONNew BuildingPermit Issued443 d$107,056,000
386-394 Symington Ave, Toronto, ONNew BuildingInspection528 d$105,000,000
628 Church St, Toronto, ONNew BuildingRevision Issued555 d$101,000,000

“Open” counts days from issue date to Oct 18, 2026. A permit remaining open does not by itself mean a project is abandoned; the City closes permits on final inspection, and some long-running projects are still legitimately active.

Track new Toronto permits the day they are issued. Historical pages show what is still open. Sign in free to see what was filed this morning.

Frequently asked questions

How many Toronto building permits from 2025 are still open?
20,487 permits issued in Toronto during 2025 were still in the City's active permit register as of Oct 18, 2026. This is the count of permits that have not closed out, not the number of permits Toronto issued in 2025. The City issues roughly 40,000 permits a year, and closed permits are removed from the published file.
How long have Toronto's 2025 permits been open?
Half of the 20,487 still-open permits from 2025 have been open for at least 450 days (about 1 year), measured from issue date to Oct 18, 2026. One in ten has been open longer than 605 days (about 1 year). These are permits the City has not closed out, which can mean a long-running project, a stalled one, or one that was finished without being signed off.
How many 2025 Toronto permits were never started?
5,516 of the 20,487 surviving 2025 permits (26.9%) sit at a status indicating work has not visibly begun, such as "Permit Issued" or "Work Not Started". The approval was granted and the file shows no progression past it. The remainder are at inspection or revision stages.
Can I compare 2025 to other years?
No. Each year's count reflects how long its permits have had to close, so an older year showing fewer permits means more of them closed, not that less was built. Comparing 2025 to another year measures elapsed time rather than construction activity. Use the status and trade breakdowns within 2025 instead.