PermitIndex

2025 permits

Toronto building permits from 2025: 20,484 are still open

Of the building permits Toronto issued in 2025, 20,484 remained in the City’s active permit register, and half of them have been open for at least 363 days.

This is not annual permit volume. The 2025 figures on this page count permits that are still openin the City of Toronto’s active permit register today. Permits drop out of that register once they close, so older years show fewer surviving records the further back you go. Toronto issues roughly 30,000 to 40,000 permits a year; the counts here are the unclosed remainder, and they cannot be compared between years as a trend.

Still open

20,484

Median time open

363 d

Median value

$100,000

Total value

$11,958,397,184

Value figures cover the 7,706 of 20,484 still-open 2025 permits that disclose an estimated construction cost. Medians, not averages: the cost distribution has a long tail and an average would overstate the typical permit.

What stage the 2025 permits are at

6,508 of them (31.8%) show no sign of work having begun: the permit was issued and the file has not moved past that point.

StatusPermitsShare
Inspection
11,355
55.4%
Permit Issued
6,442
31.4%
Revision Issued
2,599
12.7%
Work Not Started
57
0.3%
Revocation Pending
18
0.1%
Ready for Issuance
9
0.0%
Response Received
1
0.0%
Request Received
1
0.0%
Application On Hold
1
0.0%
Under Review
1
0.0%

Still-open 2025 permits by trade

TradePermitsTotal value
Plumbing4,499$604,418,040
Addition3,741$672,845,917
HVAC2,705$598,603,207
Interior alteration2,648$1,700,704,423
New build2,485$7,166,665,898
Other / unclassified1,266$85,616,844
Demolition1,074$312,897,201
Deck1,032$124,255,611
Window / Door448$35,404,472
Roofing364$143,815,946
Pool165$457,405,000
Electrical57$55,764,625

Neighbourhoods with the most open 2025 permits

RankNeighbourhoodOpen permitsTotal value
1Yonge-Bay Corridor549$280,598,610
2Annex493$725,630,165
3Banbury-Don Mills469$56,010,278
4Rosedale-Moore Park359$76,439,070
5South Riverdale350$378,224,854
6Englemount-Lawrence340$103,200,217
7Stonegate-Queensway335$308,547,352
8Edenbridge-Humber Valley316$63,318,924
9St Lawrence-East Bayfront-The Islands298$889,597,515
10West Humber-Clairville287$161,787,906
11Birchcliffe-Cliffside283$90,787,211
12High Park-Swansea272$103,420,785
13Bedford Park-Nortown265$48,383,502
14Trinity-Bellwoods242$19,501,500
15Kensington-Chinatown228$559,783,864
16Mimico-Queensway227$52,868,175
17Oakwood Village225$20,041,000
18Willowdale West224$18,339,000
19Clairlea-Birchmount223$40,423,127
20Alderwood223$28,344,000

Top 20 neighbourhoods by open-permit count. Areas outside this list still have open 2025 permits.

Largest 2025 projects still open

The highest-value permits from 2025 that have not closed out, ranked by estimated construction cost.

AddressWorkStatusOpenValue
50 Cumberland St, Toronto, ONNew BuildingRevision Issued266 d$440,000,000
3741-3751 Bloor St W, Toronto, ONNew BuildingInspection449 d$400,000,000
266 King St W, Toronto, ONNew BuildingInspection479 d$230,000,000
1 Delisle Ave, Toronto, ONNew BuildingInspection311 d$200,000,000
325 Gerrard St E, Toronto, ONShoringInspection237 d$200,000,000
1555 Queen St E, Toronto, ONNew BuildingInspection456 d$190,000,000
1245 Dupont St, Toronto, ONNew BuildingInspection224 d$190,000,000
25 St Dennis Dr, Toronto, ONNew BuildingInspection463 d$185,000,000
446 Lakeshore Ave, Toronto, ONNew BuildingPermit Issued286 d$185,000,000
6 Tippett Rd, Toronto, ONNew BuildingInspection357 d$176,636,000
162 Queens Quay E, Toronto, ONNew BuildingInspection357 d$170,000,000
1001 Queen St W, Toronto, ONNew BuildingInspection280 d$159,000,000
399 Bathurst St, Toronto, ONNew BuildingInspection337 d$152,310,000
63 Montclair Ave, Toronto, ONNew BuildingInspection373 d$150,000,000
30 Merton St, Toronto, ONNew BuildingInspection290 d$150,000,000
9 Leslie St, Toronto, ONNew BuildingPermit Issued237 d$143,626,807
2490-2504 Yonge St, Toronto, ONNew BuildingInspection512 d$142,242,800
801 The Queensway, Toronto, ONInside and Outside DrainsInspection416 d$140,000,000
5251 Dundas St W, Toronto, ONNew BuildingInspection436 d$132,915,000
55 Eastern Ave, Toronto, ONNew BuildingInspection420 d$120,000,000
1156 The Queensway, Toronto, ONNew BuildingPermit Issued204 d$118,000,000
80 Scottfield Dr, Toronto, ONNew BuildingInspection315 d$110,000,000
3450 Dufferin St, Toronto, ONNew BuildingPermit Issued356 d$107,056,000
386-394 Symington Ave, Toronto, ONNew BuildingInspection441 d$105,000,000
628 Church St, Toronto, ONNew BuildingRevision Issued468 d$101,000,000

“Open” counts days from issue date to Jul 23, 2026. A permit remaining open does not by itself mean a project is abandoned; the City closes permits on final inspection, and some long-running projects are still legitimately active.

Track new Toronto permits the day they are issued. Historical pages show what is still open. Sign in free to see what was filed this morning.

Frequently asked questions

How many Toronto building permits from 2025 are still open?
20,484 permits issued in Toronto during 2025 were still in the City's active permit register. This is the count of permits that have not closed out, not the number of permits Toronto issued in 2025. The City issues roughly 30,000 to 40,000 permits a year, and closed permits are removed from the published file.
How long have Toronto's 2025 permits been open?
Half of the 20,484 still-open permits from 2025 have been open for at least 363 days, measured from issue date to Jul 23, 2026. One in ten has been open longer than 518 days (about 1 year). These are permits the City has not closed out, which can mean a long-running project, a stalled one, or one that was finished without being signed off.
How many 2025 Toronto permits were never started?
6,508 of the 20,484 surviving 2025 permits (31.8%) sit at a status indicating work has not visibly begun, such as "Permit Issued" or "Work Not Started". The approval was granted and the file shows no progression past it. The remainder are at inspection or revision stages.
Can I compare 2025 to other years?
No. Each year's count reflects how long its permits have had to close, so an older year showing fewer permits means more of them closed, not that less was built. Comparing 2025 to another year measures elapsed time rather than construction activity. Use the status and trade breakdowns within 2025 instead.

Other years