PermitIndex

2010 permits

Toronto building permits from 2010: 5,240 are still open

Of the building permits Toronto issued in 2010, 5,240 remained in the City’s active permit register, and half of them have been open for at least 5,867 days (about 16 years).

This is not annual permit volume. The 2010 figures on this page count permits that are still openin the City of Toronto’s active permit register today. Permits drop out of that register once they close, so older years show fewer surviving records the further back you go. Toronto issues roughly 30,000 to 40,000 permits a year; the counts here are the unclosed remainder, and they cannot be compared between years as a trend.

Still open

5,240

Median time open

5,867 d

Median value

$40,000

Total value

$2,775,910,155

Value figures cover the 2,712 of 5,240 still-open 2010 permits that disclose an estimated construction cost. Medians, not averages: the cost distribution has a long tail and an average would overstate the typical permit.

What stage the 2010 permits are at

216 of them (4.1%) show no sign of work having begun: the permit was issued and the file has not moved past that point.

StatusPermitsShare
Inspection
4,317
82.4%
Revision Issued
516
9.8%
Revocation Pending
191
3.6%
Permit Issued
158
3.0%
Work Not Started
58
1.1%

Still-open 2010 permits by trade

TradePermitsTotal value
Addition1,237$118,182,367
Plumbing1,050$16,336,315
Interior alteration902$189,657,507
HVAC730$22,185,088
New build422$2,091,248,785
Deck320$26,593,739
Other / unclassified278$17,062,691
Roofing124$216,701,113
Window / Door81$15,926,550
Demolition80$58,946,000
Pool16$3,070,000

Neighbourhoods with the most open 2010 permits

RankNeighbourhoodOpen permitsTotal value
1Stonegate-Queensway146$8,728,300
2Yonge-Bay Corridor141$350,858,037
3West Humber-Clairville133$7,341,750
4South Riverdale110$1,904,800
5Rosedale-Moore Park110$15,019,500
6Kensington-Chinatown103$27,625,160
7Annex89$233,092,300
8High Park-Swansea87$3,298,260
9St Lawrence-East Bayfront-The Islands87$485,455,440
10Etobicoke City Centre86$7,305,900
11Wychwood84$4,878,800
12Yorkdale-Glen Park82$10,465,470
13Bedford Park-Nortown78$9,000,063
14Woodbine Corridor77$8,868,500
15Leaside-Bennington75$4,345,608
16Edenbridge-Humber Valley72$9,642,000
17Wellington Place70$202,291,400
18Roncesvalles67$1,746,500
19Wexford/Maryvale65$4,249,765
20Milliken64$1,986,050

Top 20 neighbourhoods by open-permit count. Areas outside this list still have open 2010 permits.

Largest 2010 projects still open

The highest-value permits from 2010 that have not closed out, ranked by estimated construction cost.

AddressWorkStatusOpenValue
674 Bay St, Toronto, ONNew BuildingInspection5,749 d$300,000,000
61 Front St W, Toronto, ONMultiple ProjectsInspection5,923 d$200,000,000
450 Bremner Blvd, Toronto, ONNew BuildingInspection5,900 d$150,000,000
50 Yorkville Ave, Toronto, ONNew BuildingInspection5,993 d$120,000,000
18 Lower Jarvis St, Toronto, ONNew BuildingInspection5,691 d$100,000,000
2242 Lake Shore Blvd W, Toronto, ONNew BuildingInspection5,697 d$90,000,000
230 Bloor St W, Toronto, ONNew BuildingInspection6,026 d$77,000,000
33 Bay St, Toronto, ONNew BuildingInspection5,964 d$65,000,000
97 St George St, Toronto, ONNew BuildingInspection5,809 d$65,000,000
75 Portland St, Toronto, ONNew BuildingInspection5,973 d$64,500,000
373 King St W, Toronto, ONNew BuildingInspection5,973 d$60,000,000
640 Fleet St, Toronto, ONNew BuildingInspection5,728 d$56,000,000
35 Hollywood Ave, Toronto, ONNew BuildingInspection5,839 d$55,500,000
60 Heintzman St, Toronto, ONNew BuildingInspection6,041 d$50,000,000
18 Lower Jarvis St, Toronto, ONNew BuildingInspection5,928 d$50,000,000
1015 Sheppard Ave E, Toronto, ONNew BuildingInspection5,841 d$50,000,000
1015 Sheppard Ave E, Toronto, ONNew BuildingInspection5,841 d$50,000,000
1015 Sheppard Ave E, Toronto, ONNew BuildingInspection5,813 d$50,000,000
1015 Sheppard Ave E, Toronto, ONNew BuildingInspection5,813 d$50,000,000
1060 Sheppard Ave W, Toronto, ONNew BuildingInspection5,802 d$50,000,000
61 Front St W, Toronto, ONInterior AlterationsInspection5,718 d$50,000,000
4346 Lawrence Ave E, Toronto, ONNew BuildingInspection5,694 d$45,000,000
1 Oakburn Cres, Toronto, ONNew BuildingInspection5,889 d$42,000,000
1 Oakburn Cres, Toronto, ONNew BuildingInspection5,889 d$42,000,000
585 Queen St W, Toronto, ONNew BuildingInspection5,831 d$30,000,000

“Open” counts days from issue date to Jul 23, 2026. A permit remaining open does not by itself mean a project is abandoned; the City closes permits on final inspection, and some long-running projects are still legitimately active.

Track new Toronto permits the day they are issued. Historical pages show what is still open. Sign in free to see what was filed this morning.

Frequently asked questions

How many Toronto building permits from 2010 are still open?
5,240 permits issued in Toronto during 2010 were still in the City's active permit register. This is the count of permits that have not closed out, not the number of permits Toronto issued in 2010. The City issues roughly 30,000 to 40,000 permits a year, and closed permits are removed from the published file.
How long have Toronto's 2010 permits been open?
Half of the 5,240 still-open permits from 2010 have been open for at least 5,867 days (about 16 years), measured from issue date to Jul 23, 2026. One in ten has been open longer than 6,007 days (about 16 years). These are permits the City has not closed out, which can mean a long-running project, a stalled one, or one that was finished without being signed off.
How many 2010 Toronto permits were never started?
216 of the 5,240 surviving 2010 permits (4.1%) sit at a status indicating work has not visibly begun, such as "Permit Issued" or "Work Not Started". The approval was granted and the file shows no progression past it. The remainder are at inspection or revision stages.
Can I compare 2010 to other years?
No. Each year's count reflects how long its permits have had to close, so an older year showing fewer permits means more of them closed, not that less was built. Comparing 2010 to another year measures elapsed time rather than construction activity. Use the status and trade breakdowns within 2010 instead.